SUBPART G—Facility Design, Fabrication, and Installation (§285.700 to §285.714)
- 285.700—What reports must I submit to MMS before installing facilities described in my approved SAP, COP, or GAP?
- 285.701—What must I include in my Facility Design Report?
- 285.702—What must I include in my Fabrication and Installation Report?
- 285.703—What reports must I submit for project modifications and repairs?
- 285.705—When must I use a Certified Verification Agent (CVA)?
- 285.706—How do I nominate a CVA for MMS approval?
- 285.707—What are the CVA's primary duties for facility design review?
- 285.708—What are the CVA's or project engineer's primary duties for fabrication and installation review?
- 285.709—When conducting onsite fabrication inspections, what must the CVA or project engineer verify?
- 285.710—When conducting onsite installation inspections, what must the CVA or project engineer do?
- 285.712—What are the CVA's or project engineer's reporting requirements?
- 285.713—What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease?
- 285.714—What records relating to SAPs, COPs, and GAPs must I keep?