285.701—What must I include in my Facility Design Report?

(a) Your Facility Design Report provides specific details of the design of any facilities, including cables and pipelines, that are outlined in your approved SAP, COP, or GAP. Your Facility Design Report must demonstrate that your design conforms to your responsibilities listed in § 285.105(a). You must include the following items in your Facility Design Report:

Code of Federal Regulations

Code of Federal Regulations 489
[Please see PDF for image: ER29AP09.132 ]

Code of Federal Regulations

Code of Federal Regulations 490
[Please see PDF for image: ER29AP09.133 ]
(b) For any floating facility, your design must meet the requirements of the U.S. Coast Guard for structural integrity and stability (e.g., verification of center of gravity). The design must also consider:
(1) Foundations, foundation pilings and templates, and anchoring systems; and
(2) Mooring or tethering systems.
(c) You must provide the location of records, as required in § 285.714(c).
(d) If you are required to use a CVA, the Facility Design Report must include one paper copy of the following certification statement: “The design of this structure has been certified by a MMS approved CVA to be in accordance with accepted engineering practices and the approved SAP, GAP, or COP as appropriate. The certified design and as-built plans and specifications will be on file at (given location).”
(e) The MMS will withhold trade secrets and commercial or financial information that is privileged or confidential from public disclosure under exemption 4 of the FOIA and in accordance with the terms of § 285.113.