285.705—When must I use a Certified Verification Agent (CVA)?
You must use a CVA to review and certify the Facility Design Report, the Fabrication and Installation Report, and the Project Modifications and Repairs Report.
(1)
Ensure that your facilities are designed, fabricated, and installed in conformance with accepted engineering practices and the Facility Design Report and Fabrication and Installation Report;
(2)
Ensure that repairs and major modifications are completed in conformance with accepted engineering practices; and
(3)
Provide MMS immediate reports of all incidents that affect the design, fabrication, and installation of the project and its components.
Code of Federal Regulations
(c)
You must submit a request to waive the requirement to use a CVA to MMS in writing, along with your SAP under § 285.610(a)(9), COP under § 285.626(b)(20), or GAP under § 285.645(c)(5).
(1)
The MMS will review your request to waive the use of the CVA and notify you of our decision along with our decision on your SAP, COP, or GAP.
(3)
If MMS waives the requirement that you use a CVA, your project engineer must perform the same duties and responsibilities as the CVA, except as otherwise provided.