17-1709 - Discharge of sewage and other offensive matter into Lake George and Skaneateles lake prohibited.

§ 17-1709. Discharge  of  sewage  and  other  offensive matter into Lake               George and Skaneateles lake prohibited.    1. No person or corporation shall cause or permit the  fall,  flow  or  discharge  into  Lake  George  or  Skaneateles  lake  or  any  of  their  tributaries,  of  any  sewage  matter,  or  other   foul,   noxious   or  deleterious, solid or liquid matter or effluent from any sewage disposal  plant, or any matter that may be declared such by the board of health of  any  municipality  adjacent  to  such lakes where any such fall, flow or  discharge shall occur.    2. The board of health of any such municipality shall examine into any  alleged offense against this section within its jurisdiction  and  cause  the same to be abated, by injunction or otherwise, if found to exist.    3.  The  discharge  of  sewage  or  treated  sewage  effluent into the  drainage basin of Lake George is hereby prohibited except as follows:    (a) Subsurface sewage disposal facilities with a  design  capacity  of  one  thousand  gallons per day or less are permitted to discharge within  the basin provided said facilities are designed,  constructed,  operated  and  maintained  in accordance with all applicable laws, regulations and  permits issued pursuant thereto.    (b) Subsurface sewage disposal facilities with a  design  capacity  of  greater  than  one  thousand  gallons per day are permitted to discharge  within the basin provided that such facilities:    (i) discharge treated sewage effluent to land or groundwater;    (ii) are designed to meet best technology available;    (iii) are  in  compliance  with  a  valid  state  pollutant  discharge  elimination system (SPDES) permit;    (iv) are designed to meet existing needs only; and    (v)   are   designed,  operated  and  maintained  in  accordance  with  applicable laws and regulations.    (c) The commissioner shall prepare a technical manual  describing  the  best  technologies  available  for sewage disposal facilities within the  Lake  George  basin,  which  shall  include,  but  not  be  limited  to,  specifications  for the design, construction, maintenance and monitoring  of such facilities and performance standards for nutrient  removal.  The  commissioner  shall  complete  the  manual within eighteen months of the  effective date of this subdivision and shall notice  completion  of  the  manual in the state register and the environmental notice bulletin.