192.503—General requirements.
(a)
No person may operate a new segment of pipeline, or return to service a segment of pipeline that has been relocated or replaced, until—
(1)
It has been tested in accordance with this subpart and § 192.619 to substantiate the maximum allowable operating pressure; and
(c)
Except as provided in § 192.505(a), if air, natural gas, or inert gas is used as the test medium, the following maximum hoop stress limitations apply:
Class location | Maximum hoop stress allowed as percentage of SMYS | |
---|---|---|
Natural gas | Air or inert gas | |
1 | 80 | 80 |
2 | 30 | 75 |
3 | 30 | 50 |
4 | 30 | 40 |
(d)
Each joint used to tie in a test segment of pipeline is excepted from the specific test requirements of this subpart, but each non-welded joint must be leak tested at not less than its operating pressure.
[35 FR 13257, Aug. 19, 1970, as amended by Amdt. 192-58, 53 FR 1635, Jan. 21, 1988; Amdt. 192-60, 53 FR 36029, Sept. 16, 1988; Amdt. 192-60A, 54 FR 5485, Feb. 3, 1989]