SUBPART K—Oil and Gas Production Requirements (§250.1150 to §250.1167)
- 250.1150—What are the general reservoir production requirements?
- 250.1151—How often must I conduct well production tests?
- 250.1152—How do I conduct well tests?
- 250.1153—When must I conduct a static bottomhole pressure survey?
- 250.1154—How do I determine if my reservoir is sensitive?
- 250.1155—What information must I submit for sensitive reservoirs?
- 250.1156—What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
- 250.1157—How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
- 250.1158—How do I receive approval to downhole commingle hydrocarbons?
- 250.1159—May the Regional Supervisor limit my well or reservoir production rates?
- 250.1160—When may I flare or vent gas?
- 250.1161—When may I flare or vent gas for extended periods of time?
- 250.1162—When may I burn produced liquid hydrocarbons?
- 250.1163—How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain?
- 250.1164—What are the requirements for flaring or venting gas containing H 2 S?
- 250.1165—What must I do for enhanced recovery operations?
- 250.1166—What additional reporting is required for developments in the Alaska OCS Region?
- 250.1167—What information must I submit with forms and for approvals?