§ 2566. Disposition of weapons-usable plutonium at Savannah River Site
(a)
Plan for construction and operation of MOX facility
(1)
Not later than February 1, 2003, the Secretary of Energy shall submit to Congress a plan for the construction and operation of the MOX facility at the Savannah River Site, Aiken, South Carolina.
(2)
The plan under paragraph (1) shall include—
(3)
(A)
Not later than February 15 each year, beginning in 2004 and continuing for as long as the MOX facility is in use, the Secretary shall submit to Congress a report on the implementation of the plan required by paragraph (1).
(b)
Corrective actions
(1)
If a report under subsection (a)(3) indicates that construction or operation of the MOX facility is behind the applicable schedule under subsection (g) by 12 months or more, the Secretary shall submit to Congress, not later than August 15 of the year in which such report is submitted, a plan for corrective actions to be implemented by the Secretary to ensure that the MOX facility project is capable of meeting the MOX production objective by January 1, 2012.
(2)
If a plan is submitted under paragraph (1) in any year after 2008, the plan shall include corrective actions to be implemented by the Secretary to ensure that the MOX production objective is met.
(3)
Any plan for corrective actions under paragraph (1) or (2) shall include established milestones under such plan for achieving compliance with the MOX production objective.
(4)
If, before January 1, 2012, the Secretary determines that there is a substantial and material risk that the MOX production objective will not be achieved by 2012 because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX facility until such risk is addressed and the Secretary certifies that the MOX production objective can be met by 2012.
(5)
If, after January 1, 2012, the Secretary determines that the MOX production objective has not been achieved because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX facility until the Secretary certifies that the MOX production objective can be met.
(6)
(A)
Upon making a determination under paragraph (4) or (5), the Secretary shall submit to Congress a report on the options for removing from the State of South Carolina an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the State of South Carolina after April 15, 2002.
(B)
Each report under subparagraph (A) shall include an analysis of each option set forth in the report, including the cost and schedule for implementation of such option, and any requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to consideration or selection of such option.
(c)
Contingent requirement for removal of plutonium and materials from Savannah River Site
If the MOX production objective is not achieved as of January 1, 2012, the Secretary shall, consistent with the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and other applicable laws, remove from the State of South Carolina, for storage or disposal elsewhere—
(d)
Economic and impact assistance
(1)
If the MOX production objective is not achieved as of January 1, 2014, the Secretary shall, subject to the availability of appropriations, pay to the State of South Carolina each year beginning on or after that date through 2019 for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the later of—
(2)
(A)
If, as of January 1, 2020, the MOX facility has not processed mixed-oxide fuel from defense plutonium and defense plutonium materials in the amount of not less than—
the Secretary shall, from funds available to the Secretary, pay to the State of South Carolina for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the removal by the Secretary from the State of South Carolina of an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2020, but not processed by the MOX facility.
(3)
If the State of South Carolina obtains an injunction that prohibits the Department from taking any action necessary for the Department to meet any deadline specified by this subsection, that deadline shall be extended for a period of time equal to the period of time during which the injunction is in effect.
(e)
Failure to complete planned disposition program
If on July 1 each year beginning in 2023 and continuing for as long as the MOX facility is in use, less than 34 metric tons of defense plutonium or defense plutonium materials have been processed by the MOX facility, the Secretary shall submit to Congress a plan for—
(f)
Removal of mixed-oxide fuel upon completion of operations of MOX facility
If, one year after the date on which operation of the MOX facility permanently ceases, any mixed-oxide fuel remains at the Savannah River Site, the Secretary shall submit to Congress—
(g)
Baseline
Not later than December 31, 2006, the Secretary shall submit to Congress a report on the construction and operation of the MOX facility that includes a schedule for revising the requirements of this section during fiscal year 2007 to conform with the schedule established by the Secretary for the MOX facility, which shall be based on estimated funding levels for the fiscal year.
(h)
Definitions
In this section:
(1)
MOX production objective
The term “MOX production objective” means production at the MOX facility of mixed-oxide fuel from defense plutonium and defense plutonium materials at an average rate equivalent to not less than one metric ton of mixed-oxide fuel per year. The average rate shall be determined by measuring production at the MOX facility from the date the facility is declared operational to the Nuclear Regulatory Commission through the date of assessment.