§ 2545. Procedures for meeting tritium production requirements
(a)
Production of new tritium
The Secretary of Energy shall produce new tritium to meet the requirements of the Nuclear Weapons Stockpile Memorandum at the Tennessee Valley Authority Watts Bar or Sequoyah nuclear power plants consistent with the Secretary’s December 22, 1998, decision document designating the Secretary’s preferred tritium production technology.
(b)
Support
To support the method of tritium production set forth in subsection (a), the Secretary shall design and construct a new tritium extraction facility in the H-Area of the Savannah River Site, Aiken, South Carolina.
(c)
Design and engineering development
The Secretary shall—