§ 76q-1. John F. Kennedy Center Plaza
(a)
Definitions
In this section, the following definitions apply:
(1)
Air rights
The term “air rights” means real property interests conveyed by deed, lease, or permit for the use of space between streets and alleys within the boundaries of the Project.
(3)
Green spaces
The term “green spaces” means areas within the boundaries of the Project or affected by the Project that are covered by grass, trees, or other vegetation.
(4)
Plaza
The term “Plaza” means improvements to the area surrounding the John F. Kennedy Center building carried out under the Project and comprised of transportation elements (including roadways, sidewalks, and bicycle lanes) and non-transportation elements (including landscaping, green space, open public space, water, sewer, and utility connections).
(5)
Project
The term “Project” means the Plaza project, as described in the TEA–21 report, providing for construction of a Plaza adjacent to the Center and for improved bicycle, pedestrian, and vehicular access to and around the Center. The term includes planning, design, engineering, and construction of the Plaza, buildings to be constructed on the Plaza, and related transportation improvements and may include any other elements of the Project identified in the TEA–21 report.
(7)
TEA–21 report
The term “TEA–21 report” means the report of the Secretary submitted to Congress under section 1214 of the Transportation Equity Act for the 21st Century (20 U.S.C. 76j note ; 112 Stat. 204).
(b)
Responsibilities of the Secretary
(1)
In general
The Secretary shall be responsible for the Project and may undertake such activities as may be necessary to construct the Project, other than buildings to be constructed on the Plaza, substantially as described in the TEA–21 report.
(2)
Planning, design, engineering, and construction
The Secretary shall be responsible for the planning, design, engineering, and construction of the Project, other than buildings to be constructed on the Plaza.
(3)
Agreements with the Board and other agencies
The Secretary shall enter into memoranda of agreement with the Board and any appropriate Federal or other governmental agency to facilitate the planning, design, engineering, and construction of the Project.
(4)
Consultation with the Board
The Secretary shall consult with the Board to maximize efficiencies in planning and executing the Project, including the construction of any buildings on the Plaza.
(5)
Contracts
Subject to the approval of the Board, the Secretary may enter into contracts on behalf of the Center related to the planning, design, engineering, and construction of the Project.
(c)
Responsibilities of the Board
(1)
In general
The Board, in consultation with the Project Team, may undertake such activities as may be necessary to construct buildings on the Plaza for the Project.
(2)
Receipt of transfers of air rights
The Board may receive from the District of Columbia such transfers of air rights as may be necessary for the planning, design, engineering, and construction of the Project.
(3)
Construction of buildings
The Board, in consultation with the Project Team, may construct, with non-appropriated funds, buildings on the Plaza for the Project and shall be responsible for the planning, design, engineering, and construction of the buildings.
(4)
Acknowledgment of contributions
(5)
Approval by Project Team
Notwithstanding section
76k
(e) of this title, any decision by the Board that will significantly affect, as determined by the Project Team in consultation with the Board, the scope, cost, schedule, or engineering feasibility of any element of the Project, other than buildings to be constructed on the Plaza, shall be subject to the approval of the Project Team.
(d)
Responsibilities of the District of Columbia
(1)
Modification of highway system
Notwithstanding any State or local law, the Mayor of the District of Columbia, in consultation with the National Capital Planning Commission and the Secretary, shall have exclusive authority to amend or modify the permanent system of highways of the District of Columbia as may be necessary to meet the requirements and needs of the Project.
(2)
Conveyances
(A)
Authority
Notwithstanding any State or local law, the Mayor of the District of Columbia shall have exclusive authority to convey or dispose of any interests in real estate (including air rights or air space as that term is defined by District of Columbia law) owned or controlled by the District of Columbia, as may be necessary to meet the requirements and needs of the Project.
(B)
Conveyance to the Board
Not later than 90 days following the date of receipt of notification from the Secretary of the requirements and needs of the Project, the Mayor of the District of Columbia shall convey or dispose of to the Board without compensation interests in real estate described in subparagraph (A).
(e)
Ownership
(1)
Roadways and sidewalks
Upon completion of the Project, responsibility for maintenance and oversight of roadways and sidewalks modified or improved for the Project shall remain with the owner of the affected roadways and sidewalks.
(f)
National highway boundaries
(g)
GAO review
Until completion of the Project, the Comptroller General shall review the management and oversight of construction of the Project by the Board and report periodically on the results of the review to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate.