62.1-117 - Notice required.
§ 62.1-117. Notice required.
Of such application ten days' previous notice shall be given in the mannerprescribed in Article 2 (§ 25.1-205 et seq.) of Chapter 2 of Title 25.1 toeach tenant, or the guardian, conservator or committee of the tenant, of thefreehold of any lands not owned by the applicant, upon which it is desired toabut a dam, or through which it is desired to cut or enlarge a canal, orconstruct the work aforesaid.
(Code 1950, § 62-96; 1968, c. 659; 1997, c. 801.)