54-8a-10 - Installation of nonmetallic facilities.
54-8a-10. Installation of nonmetallic facilities.
Any operator installing a nonmetallic facility, such as a sewer, water, or fiber optic line,shall install the nonmetallic facility so that it can be located with standard underground facilitydetection devices or in a concrete conduit system.
Amended by Chapter 344, 2008 General Session