5537.07 Bidding process for contracts exceeding $50,000.
5537.07 Bidding process for contracts exceeding $50,000.
(A) When the cost to the Ohio turnpike commission under any contract with a person other than a governmental agency involves an expenditure of more than fifty thousand dollars, the commission shall make a written contract with the lowest responsive and responsible bidder in accordance with section 9.312 of the Revised Code after advertisement for not less than two consecutive weeks in a newspaper of general circulation in Franklin county, and in such other publications as the commission determines, which notice shall state the general character of the work and the general character of the materials to be furnished, the place where plans and specifications therefor may be examined, and the time and place of receiving bids. The commission may require that the cost estimate for the construction, demolition, alteration, repair, improvement, renovation, or reconstruction of roadways and bridges for which the commission is required to receive bids be kept confidential and remain confidential until after all bids for the public improvement have been received or the deadline for receiving bids has passed. Thereafter, and before opening the bids submitted for the roadways and bridges, the commission shall make the cost estimate public knowledge by reading the cost estimate in a public place. The commission may reject any and all bids. The requirements of this division do not apply to contracts for the acquisition of real property or compensation for professional or other personal services.
(B) Each bid for a contract for construction, demolition, alteration, repair, improvement, renovation, or reconstruction shall contain the full name of every person interested in it and shall meet the requirements of section 153.54 of the Revised Code.
(C) Other than for a contract referred to in division (B) of this section, each bid for a contract that involves an expenditure in excess of one hundred fifty thousand dollars or any contract with a service facility operator shall contain the full name of every person interested in it and shall be accompanied by a sufficient bond or certified check on a solvent bank that if the bid is accepted a contract will be entered into and the performance of its proposal secured.
(D) Other than a contract referred to in division (B) of this section, a bond with good and sufficient surety, in a form as prescribed and approved by the commission, shall be required of every contractor awarded a contract that involves an expenditure in excess of one hundred fifty thousand dollars or any contract with a service facility operator. The bond shall be in an amount equal to at least fifty per cent of the contract price and shall be conditioned upon the faithful performance of the contract.
(E) Notwithstanding any other provisions of this section, the commission may establish a program to expedite special projects by combining the design and construction elements of any public improvement project into a single contract. The commission shall prepare and distribute a scope of work document upon which the bidders shall base their bids. At a minimum, bidders shall meet the requirements of section 4733.161 of the Revised Code. Except in regard to those requirements relating to providing plans, the commission shall award contracts following the requirements set forth in divisions (A), (B), (C), and (D) of this section.
Amended by 128th General Assembly ch. 1, HB 2, § 101.01, eff. 7/1/2009.
Effective Date: 04-05-2001; 09-16-2004; 03-23-2005