400 - Notice of beginning.

§  400.  Notice  of  beginning.  Every  operator  opening a new shaft,  incline, tunnel or quarry shall report in writing its location  and  the  name  of  its  owner to the commissioner before the excavation reaches a  depth of twenty-five feet.