Chapter 103E Drainage
- Section 103E.005 Definitions
- Section 103E.011 Drainage Authority Powers
- Section 103E.015 Considerations before Drainage Work is Done
- Section 103E.021 Ditches Must Be Planted with Perennial Vegetation
- Section 103E.025 Procedure for Drainage Project That Affects State Land or Water Area Used for Conservation
- Section 103E.031 Connection with Drains in Adjoining States
- Section 103E.035 Defective Notice
- Section 103E.041 Personal Service in Lieu of Other Methods of Notice
- Section 103E.043 Informal Meetings
- Section 103E.045 Failure of Drainage Authority to Attend Hearings
- Section 103E.051 Defective Proceedings
- Section 103E.055 Reimbursement of Cost of Former Surveys When Used Later
- Section 103E.061 Right of Entry
- Section 103E.065 Drainage Inspectors
- Section 103E.067 Ditch Buffer Strip Annual Reporting
- Section 103E.071 County Attorney
- Section 103E.075 Obstruction of Drainage System
- Section 103E.081 Crimes Related to Drainage Systems; Penalties
- Section 103E.085 Enforcement
- Section 103E.091 Appeals
- Section 103E.095 Appeal from Orders Dismissing or Establishing Drainage Systems
- Section 103E.097 Payment of Attorney Fees on Appeal
- Section 103E.101 Drainage Proceeding and Construction Records
- Section 103E.105 Advice About Drainage Questions
- Section 103E.111 Field Surveys and Investigations by Director
- Section 103E.115 Hydrological and Drainage Information
- Section 103E.121 Drain Tile Manufacturing Studies
- Section 103E.202 Petitions
- Section 103E.212 New Drainage System Projects
- Section 103E.215 Improvement of Drainage System
- Section 103E.221 Improvement of Outlets
- Section 103E.225 Laterals
- Section 103E.227 Impounding, Rerouting, and Diverting Drainage System Waters
- Section 103E.231 Dismissal or Delay of Proceedings by Petitioners
- Section 103E.235 Drainage System in Two or More Counties
- Section 103E.238 County Attorney Review of Petition and Bond
- Section 103E.241 Engineer
- Section 103E.245 Preliminary Survey and Preliminary Survey Report
- Section 103E.251 Filing Preliminary Survey Report
- Section 103E.255 Commissioner's Preliminary Advisory Report
- Section 103E.261 Preliminary Hearing
- Section 103E.265 Order for Detailed Survey and Detailed Survey Report
- Section 103E.271 Detailed Survey
- Section 103E.275 Engineer's Variance from Drainage Authority Order
- Section 103E.281 Soil Survey
- Section 103E.285 Detailed Survey Report
- Section 103E.291 Filing Detailed Survey Report
- Section 103E.295 Revision of Engineer's Detailed Survey Report after Acceptance
- Section 103E.301 Commissioner's Final Advisory Report
- Section 103E.305 Viewers' Appointment and Qualification
- Section 103E.311 Viewers' Duties
- Section 103E.315 Assessment of Drainage Benefits and Damages
- Section 103E.321 Viewers' Report
- Section 103E.323 Property Owners' Report
- Section 103E.325 Final Hearing Notice
- Section 103E.331 Jurisdiction of Property by Drainage Authority
- Section 103E.335 Proceedings at the Final Hearing
- Section 103E.341 Drainage Authority Final Order
- Section 103E.345 Apportionment of Cost for Joint County Drainage Systems
- Section 103E.351 Redetermination of Benefits and Damages
- Section 103E.401 Use of Drainage System As an Outlet
- Section 103E.405 Outlets in Adjoining States
- Section 103E.411 Drainage System As Outlet for Municipality
- Section 103E.501 Contract and Bond
- Section 103E.505 Awarding the Construction Contract
- Section 103E.511 Procedure If Contract is Not Awarded Due to Bids or Costs
- Section 103E.515 Damages, Payment
- Section 103E.521 Supervision of Construction
- Section 103E.525 Construction and Maintenance of Bridges and Culverts
- Section 103E.526 Construction of Road Instead of Bridge or Culvert
- Section 103E.53 Rules to Standardize Forms
- Section 103E.531 Inspection of Drainage Construction and Partial Payments
- Section 103E.535 Partial Payment of Retained Contract Amounts
- Section 103E.541 Extension of Time on Contracts
- Section 103E.545 Reduction of Contractor's Bond
- Section 103E.551 Contractor's Default
- Section 103E.555 Acceptance of Contract
- Section 103E.601 Drainage Lien Statement
- Section 103E.605 Effect of Filed Drainage Lien
- Section 103E.611 Payment of Drainage Liens and Interest
- Section 103E.615 Enforcement of Assessments
- Section 103E.621 Satisfaction of Liens
- Section 103E.625 Subdivision by Platting Must Have Liens Apportioned
- Section 103E.631 Apportionment of Liens
- Section 103E.635 Drainage Bond Issues
- Section 103E.641 Drainage Funding Bonds
- Section 103E.645 Allowance and Payment of Fees and Expenses
- Section 103E.651 Drainage System Account
- Section 103E.655 Payment of Drainage System Costs
- Section 103E.661 Examination and Establishment of Drainage System Accounts by State Auditor
- Section 103E.701 Repairs
- Section 103E.705 Repair Procedure
- Section 103E.711 Cost Apportionment for Joint County Drainage Systems
- Section 103E.715 Procedure for Repair by Petition
- Section 103E.721 Replacement and Hydraulic Capacity of Bridges and Culverts
- Section 103E.725 Cost of Repair
- Section 103E.728 Apportionment of Repair Costs
- Section 103E.731 Assessment; Bonds
- Section 103E.735 Drainage System Repair Fund
- Section 103E.741 Inclusion of Property That Has Not Been Assessed Benefits
- Section 103E.745 Cost of Repair Exceeding Benefits in Anoka County
- Section 103E.801 Consolidation or Division of Drainage Systems
- Section 103E.805 Removal of Property from a Drainage System
- Section 103E.806 Partial Abandonment of a Drainage System
- Section 103E.811 Abandonment of Drainage System
- Section 103E.812 Transfer of All or Part of Drainage System