Section 27-106 - Contractors - Notice required.     

§ 27-106.Contractors - Notice required.
 

(a)  Definitions.-  

(1) In this section the following words have the meanings indicated. 

(2) "Construction contractor" means a person that performs or is hired to perform road construction work. 

(3) "Road construction work" means the construction, repair, paving, repaving, or grading of a public roadway. 

(b)  Construction notification - Required.- Before beginning road construction work on a public roadway in the sanitary district in which a water, sewer, or stormwater management structure is installed, a construction contractor shall give notice to the Commission and the county of the proposed construction work. 

(c)  Construction notification - Contents.- The notice: 

(1) shall include the proposed construction schedule and information about the location of construction to accomplish the purposes of this section; 

(2) except in emergency road repair situations, shall be given to the Commission and the county at least 7 days before road construction work begins; and 

(3) in an emergency road repair situation, shall be given to the Commission and the county as promptly as feasible under the emergency situation. 

(d)  Commission structures - Disturbance prohibited.- Unless allowed by the Commission or the county, as appropriate, a person may not disturb, remove, pave over, or repave over a manhole, valve, fitting, or other Commission water or sewer structure or county stormwater management structure. 
 

[An. Code 1957, art. 29, § 10-108; 2010, ch. 37, § 3.]