45A.181 Requirements for request for proposal when capital project is to be constructed utilizing the design-build construction method.

Download pdf

Loading PDF...


Page 1 of 1 45A.181 Requirements for request for proposal when capital project is to be constructed utilizing the design-build construction method. When a capital project is to be constructed utilizing the design-build construction method <br>in accordance with KRS 45A.180, the percentage of scoring to be attributed to the <br>guaranteed maximum price shall be stated in the request for proposal. A request for <br>proposal may allow for the payment of stipends for the technical proposal phase provided <br>that the amount of the stipends and the terms under which stipends are to be paid are <br>stated in the request for proposal. Effective: June 24, 2003 <br>History: Created 2003 Ky. Acts ch. 98, sec. 8, effective June 24, 2003.