357.19 - COMPLETING ASSESSMENT.

        357.19  COMPLETING ASSESSMENT.         After the final acceptance of the work by the board of      supervisors, the engineer shall complete the final assessment, which      shall be made on all the property within the district, whether      abutting or not, for an amount approximately ten percent greater than      the total cost of the project.  The assessment shall not exceed      benefits conferred and shall take into consideration the location and      value of the property assessed.  Where a pipe in excess of six inches      in diameter is used, the assessment against the abutting property      shall be limited to the cost of a six-inch pipe, and the difference      between the cost of the pipe used and a six-inch pipe shall be paid      by a uniform assessment against all benefited property within the      water district.  The final assessment on any lot or parcel of land      shall not exceed the final preliminary assessment by more than ten      percent, and shall in no case exceed twenty-five percent of the      actual value of the property.  The board of supervisors may alter an      assessment to increase or decrease it within the limits outlined      above, and must approve by resolution the final assessment as made.      
         Section History: Early Form
         [C24, 27, 31, 35, § 5522; C39, § 5526.19; C46, 50, 54, 58, 62,      66, 71, 73, 75, 77, 79, 81, § 357.19]