314.12A - PRESERVATION OF TOPSOIL IN HIGHWAY CONSTRUCTION.

        314.12A  PRESERVATION OF TOPSOIL IN HIGHWAY      CONSTRUCTION.         In the award of contracts for the construction, reconstruction,      improvement, and repair, except for minor maintenance, of a highway,      the state department of transportation shall require that when fill      dirt, soil, or other materials are to be removed from an area      acquired by title or easement, whether by agreement or condemnation,      for use in the project, adequate provision shall be made for the      salvage of topsoil from the area for use in the restoration of the      specified critical areas of the project by replacement of salvaged      topsoil, by fertilizing and mulching if necessary, or by other      appropriate measures to provide vegetative cover to prevent erosion,      including filling or covering the area with compost, except where a      lake or subwater table conditions exist, where deep loess is present,      or where outside ditch bottoms and backslopes are present in rock cut      areas.  This section shall not apply to borrow pits covered by      section 314.12.  
         Section History: Recent Form
         2002 Acts, ch 1103, §1