309.35 - WHEN SURVEYS REQUIRED.

        309.35  WHEN SURVEYS REQUIRED.         Before proceeding to the construction of any road or roads      included in the secondary road construction program where the      grading, exclusive of bridges and culverts, is estimated to cost over      ten thousand dollars per mile, the county engineer shall cause      detailed surveys and plans for the road or roads to be prepared.  
         Section History: Early Form
         [C24, 27, § 4643; C31, 35, § 4644-c37; C39, § 4644.35; C46,      50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, § 309.35] 
         Section History: Recent Form
         2001 Acts, ch 32, §2