203C.40 - PRIORITIZATION OF INSPECTIONS OF WAREHOUSE OPERATORS.
203C.40 PRIORITIZATION OF INSPECTIONS OF WAREHOUSE OPERATORS. The department shall develop a system to prioritize the inspections of warehouse operators provided in section 203C.2. The system of prioritization shall be computed each year based on the risk of loss to the grain depositors and sellers indemnity fund caused by the possible insolvency of the warehouse operator. The department shall compute the risk by utilizing an available statistical model to measure the financial condition of warehouse operators. Procedures for utilizing the statistical model shall be adopted by department rules. The statistical model shall be used to provide risk ratings. A risk rating shall be used as a factor by the department to prioritize its inspection schedule. The department may inspect a warehouse operator at any time based on a risk of loss to the fund according to the risk rating. A substantial risk of loss to the grain depositors and sellers indemnity fund caused by the possible insolvency of the warehouse operator based on the statistical model shall be good cause.Section History: Recent Form
92 Acts, ch 1239, §77 Referred to in § 203C.1, 203C.2