478.3 - PETITION -- REQUIREMENTS.

        478.3  PETITION -- REQUIREMENTS.         1.  All petitions shall set forth:         a.  The name of the individual, company, or corporation asking      for the franchise.         b.  The principal office or place of business.         c.  The starting points, routes, and termini of the proposed      lines, accompanied with a map or plat showing such details.         d.  A general description of the public or private lands,      highways, and streams over, across, or along which any proposed line      will pass.         e.  General specifications as to materials and manner of      construction.         f.  The maximum voltage to be carried over each line.         g.  Whether or not the exercise of the right of eminent domain      will be used and, if so, a specific reference to the lands described      in paragraph "d" which are sought to be subject thereto.         h.  An allegation that the proposed construction is necessary      to serve a public use.         2.  Petitions for transmission lines capable of operating at      sixty-nine kilovolts or more and extending a distance of not less      than one mile across privately owned real estate shall also set forth      an allegation that the proposed construction represents a reasonable      relationship to an overall plan of transmitting electricity in the      public interest and substantiation of such allegations, including but      not limited to, a showing of the following:         a.  The relationship of the proposed project to present and      future economic development of the area.         b.  The relationship of the proposed project to comprehensive      electric utility planning.         c.  The relationship of the proposed project to the needs of      the public presently served and future projections based on      population trends.         d.  The relationship of the proposed project to the existing      electric utility system and parallel existing utility routes.         e.  The relationship of the proposed project to any other      power system planned for the future.         f.  The possible use of alternative routes and methods of      supply.         g.  The relationship of the proposed project to the present      and future land use and zoning ordinances.         h.  The inconvenience or undue injury which may result to      property owners as a result of the proposed project.         The utilities board may waive the proof required for such      allegations which are not applicable to a particular proposed      project.         The petition shall contain an affidavit stating that informational      meetings were held in each county which the proposed project will      affect and the time and place of each meeting.         3.  For the purpose of this section, the term "public" shall      not be interpreted to be limited to consumers located in this state.      
         Section History: Early Form
         [S13, § 2120-n; C24, 27, 31, 35, 39, § 8311; C46, 50, 54, 58,      62, 66, 71, 73, 75, § 489.3; C77, 79, 81, § 478.3] 
         Section History: Recent Form
         94 Acts, ch 1136, §3; 2001 Acts, 1st Ex, ch 4, §34, 36; 2002 Acts,      ch 1048, §3, 5         Referred to in § 478.1, 478.31