459A.207 - CONSTRUCTION CERTIFICATION.

        459A.207  CONSTRUCTION CERTIFICATION.         1.  The owner of an open feedlot operation who is issued a      construction permit for a settled open feedlot effluent basin as      provided in section 459A.205 after July 1, 2005, shall submit to the      department a construction certification from a licensed professional      engineer certifying all of the following:         a.  The basin was constructed in accordance with the design      plans submitted to the department as part of an application for a      construction permit pursuant to section 459A.205.  If the actual      construction deviates from the approved design plans, the      construction certification shall identify all changes and certify      that the changes were consistent with all applicable standards of      this section.         b.  The basin was inspected by the licensed professional      engineer after completion of construction and before commencement of      operation.         2.  A written record of an investigation for drainage tile lines,      including the findings of the investigation and actions taken to      comply with subchapter III, shall be submitted as part of the      construction certification.  
         Section History: Recent Form
         2005 Acts, ch 136, §9         Referred to in § 459A.102, 459A.302