459.311C - STOCKPILING DRY MANURE ON TERRAIN OTHER THAN KARST TERRAIN.

        459.311C  STOCKPILING DRY MANURE ON TERRAIN OTHER THAN      KARST TERRAIN.         A person stockpiling dry manure on terrain, other than karst      terrain, for more than fifteen consecutive days shall comply with any      of the following:         1.  Stockpile dry manure using any of the following:         a.  A qualified stockpile structure.         b.  A qualified stockpile cover.  However, the person shall      not stockpile dry manure using a qualified stockpile cover at a      long-term stockpile location unless the person stockpiles the dry      manure on compacted soil, compacted granular aggregates, asphalt,      concrete, or other similar materials.         2.  Deliver a stockpile inspection statement to the department as      follows:         a.  The department must receive the statement by the fifteenth      day of each month.         b.  The stockpile inspection statement shall provide the      location of the stockpile and document the results of an inspection      conducted by the person during the previous month.  The inspection      must evaluate whether precipitation-induced runoff is draining away      from the stockpile and, if so, describe actions taken to prevent the      runoff.  If an inspection by the department documents that      precipitation-induced runoff is draining away from a stockpile, the      person shall immediately remove dry manure from the stockpile in      compliance with this chapter or comply with all directives of the      department to prevent the runoff.         c.  The stockpile inspection statement must be in writing and      may be on a form prescribed by the department.  
         Section History: Recent Form
         2009 Acts, ch 38, §11, 16