455B.448 - DECISION BY COMMISSION.

        455B.448  DECISION BY COMMISSION.         1.  The commission shall grant or deny the site license.  In      making its decision, the commission shall consider the following:         a.  The need for the services to be offered by the facility.         b.  The impact of the proposed facility on the area in which      it is to be located.         c.  The zoning classification of the proposed site and the      extent to which a proposed site is by present or projected use      dedicated to industrial development.         d.  The land uses and the density of population in areas near      the facility.         e.  The density of population in areas adjacent to probable      transportation routes to the facility.         f.  The risk and effect of accidents during the transportation      of hazardous wastes to the site.         g.  The geology of the site, where relevant, with reference to      factors which include, but are not limited to, the presence of fault      zones and the risk of contamination of ground and surface waters by      leaching and runoff from the facility.         h.  The risk and effect of fires or explosions from improper      storage and disposal methods.         i.  The impact of the facility on the operations and      responsibilities of the city and county in which the facility is      proposed to be located and on cities and counties near the proposed      site.         j.  Local ordinances, permits, or other requirements and their      relationship to the proposed facility.         k.  The availability of alternative sites and methods of      treatment, disposal, or storage, including cost comparisons.  The      cost comparisons shall cover short and long-term costs including, but      not limited to, liability insurance, postclosure maintenance,      monitoring of ground and surface waters, monitoring of air before and      after closure, and the potential loss of land or water resources due      to contamination.         l.  To the maximum extent feasible a site should be located      away from all of the following areas:         (1)  Areas subject to natural hazards including, but not limited      to, flooding, earthquakes, or subsidence.         (2)  Sources of drinking water supply including, but not limited      to, reservoirs, lakes and rivers and their watersheds, and aquifers      and their recharge areas.         (3)  Fragile land areas including, but not limited to, wetlands      and the shorelines of rivers, lakes, and streams.         (4)  Areas with rare or valuable ecosystems or geologic formations      or significant wildlife habitat.         (5)  Unique scenic or historic areas.         (6)  Residential areas, parks, or schools.         (7)  Prime farmland as defined by the United States department of      agriculture in 7 C.F.R. § 657.5(a).         m.  Other criteria adopted by rule which the commission finds      relevant to the siting of a facility which are consistent with this      part 6 of division IV.         2.  The commission shall grant the license if it finds that the      facility will meet the requirements imposed by rules adopted by the      commission under section 455B.412, subsection 2, and the permit      requirement of section 455B.415, that operation of the facility at      the proposed location will be in the public interest, and that the      public health and welfare and the environment will be adequately      protected.  The failure of the proposed facility to meet zoning      requirements established under chapters 329, 335, and 414, and the      licensing requirements of regulatory agencies except the requirements      imposed by sections 455B.412, subsection 2, and section 455B.415      shall not preclude the commission from issuing the license and to      that extent this subsection supersedes the licensing requirements of      regulatory agencies and the requirements of chapters 329, 335, and      414.         3.  A municipality as defined in section 670.1, subsection 2, is      not liable in an action for damages arising out of the construction,      operation, or maintenance of a hazardous waste facility which is      licensed by the commission under this part 6 of division IV unless      the municipality is responsible for or in control of the facility.      However, a municipality may be subject to liability for damages      caused by hazardous waste in connection with an act or omission which      would otherwise subject the municipality to liability.  A      municipality shall not be required to pay any portion of the costs      associated with the response to a release or threatened release of a      hazardous waste from a facility into the land, air, or water that      threatens or may threaten human health or the environment unless the      municipality is responsible for or in control of the facility or      unless the municipality is otherwise subject to liability under this      subsection.  
         Section History: Early Form
         [81 Acts, ch 152, § 8] 
         Section History: Recent Form
         86 Acts, ch 1149, § 2