CHAPTER 18. GENERAL COAL MINE PERMITS
IC 13-18-18
Chapter 18. General Coal Mine Permits
IC 13-18-18-1
Rules
Sec. 1. The board with jurisdiction over National Pollutant
Discharge Elimination System permits for coal mines shall adopt
rules under IC 4-22-2 to establish a general coal mine permit that
may be obtained for a facility instead of obtaining another more
specialized National Pollutant Discharge Elimination System coal
mine permit.
As added by P.L.1-1996, SEC.8.
IC 13-18-18-2
Criteria for consideration
Sec. 2. The board shall determine the criteria that must be met to
qualify for the general permit.
As added by P.L.1-1996, SEC.8.
IC 13-18-18-3
Notice of intent
Sec. 3. The rules adopted under this chapter must allow a coal
mine operator the option of submitting a notice of intent to be
governed by the general permit requirements before the requirements
apply to the coal mine operator.
As added by P.L.1-1996, SEC.8.