CHAPTER 18. GENERAL COAL MINE PERMITS

IC 13-18-18
     Chapter 18. General Coal Mine Permits

IC 13-18-18-1
Rules
    
Sec. 1. The board with jurisdiction over National Pollutant Discharge Elimination System permits for coal mines shall adopt rules under IC 4-22-2 to establish a general coal mine permit that may be obtained for a facility instead of obtaining another more specialized National Pollutant Discharge Elimination System coal mine permit.
As added by P.L.1-1996, SEC.8.

IC 13-18-18-2
Criteria for consideration
    
Sec. 2. The board shall determine the criteria that must be met to qualify for the general permit.
As added by P.L.1-1996, SEC.8.

IC 13-18-18-3
Notice of intent
    
Sec. 3. The rules adopted under this chapter must allow a coal mine operator the option of submitting a notice of intent to be governed by the general permit requirements before the requirements apply to the coal mine operator.
As added by P.L.1-1996, SEC.8.