Sec. 16-50r. Report of forecast of loads and resources. Confidential information. Regulations. Investigation of life-cycle costs for overhead and underground transmission lines: Scope, hearings, consu
Sec. 16-50r. Report of forecast of loads and resources. Confidential information. Regulations. Investigation of life-cycle costs for overhead and underground
transmission lines: Scope, hearings, consultants, assessment. (a) Every person engaged in electric transmission services, as defined in section 16-1, electric generation
services, as defined in said section, or electric distribution services, as defined in said
section generating electric power in the state utilizing a generating facility with a capacity greater than one megawatt, shall, annually, on or before March first, file a report on
a forecast of loads and resources which may consist of an update of the previous year's
report with the council for its review. The report shall cover the ten-year forecast period
beginning with the year of the report. Upon request, the report shall be made available
to the public. The report shall include, as applicable: (1) A tabulation of estimated peak
loads, resources and margins for each year; (2) data on energy use and peak loads for
the five preceding calendar years; (3) a list of existing generating facilities in service;
(4) a list of scheduled generating facilities for which property has been acquired, for
which certificates have been issued and for which certificate applications have been
filed; (5) a list of planned generating units at plant locations for which property has been
acquired, or at plant locations not yet acquired, that will be needed to provide estimated
additional electrical requirements, and the location of such facilities; (6) a list of planned
transmission lines on which proposed route reviews are being undertaken or for which
certificate applications have already been filed; (7) a description of the steps taken to
upgrade existing facilities and to eliminate overhead transmission and distribution lines
in accordance with the regulations and standards described in section 16-50t; and (8)
for each private power producer having a facility generating more than one megawatt
and from whom the person furnishing the report has purchased electricity during the
preceding calendar year, a statement including the name, location, size and type of
generating facility, the fuel consumed by the facility and the by-product of the consumption. Confidential, proprietary or trade secret information provided under this section
may be submitted under a duly granted protective order. The council may adopt regulations, in accordance with the provisions of chapter 54, that specify the expected filing
requirements for persons that transmit electric power in the state, electric distribution
companies, and persons that generate electric power in the state utilizing a generating
facility with a capacity of greater than one megawatt. Until such regulations are adopted,
persons that transmit electric power in the state shall file reports pursuant to this section
that include the information requested in subdivisions (6) and (7) of this subsection;
electric distribution companies in the state shall file reports pursuant to this section that
include the information requested in subdivisions (1), (2), (7) and (8) of this subsection;
persons that generate electric power in the state utilizing a generating facility with a
capacity greater than one megawatt shall file reports pursuant to this section that include
the information requested in subdivisions (3), (4), (5) and (8) of this subsection. The
council shall hold a public hearing on such filed forecast reports annually. The council
shall conduct a review in an executive session of any confidential, proprietary or trade
secret information submitted under a protective order during such a hearing. At least
one session of such hearing shall be held after six-thirty p.m. Upon reviewing such
forecast reports, the council may issue its own report assessing the overall status of loads
and resources in the state. If the council issues such a report, it shall be made available
to the public and shall be furnished to each member of the joint standing committee of
the General Assembly having cognizance of matters relating to energy and technology,
any other member of the General Assembly making a written request to the council for
the report and such other state and municipal bodies as the council may designate.
(b) On October 1, 1994, and not less than once every five years thereafter, the council
shall establish a proceeding to investigate and determine life-cycle costs for both overhead and underground transmission line alternatives. The council shall determine the
schedule and scope of the investigation at a publicly noticed meeting held not earlier
than ninety days preceding the first public hearing on the matter. The scope of the
investigation shall include, but not be limited to, an inquiry of all relevant life-cycle costs,
relative reliability, constraints concerning access and construction, potential damage to
the environment and compatibility with the existing electric supply system. As part of
the investigation the council shall hold public hearings which shall afford all interested
parties opportunity to be heard. At least one public hearing shall be held after six-thirty p.m.
(c) An investigation conducted pursuant to subsection (b) of this section may include the retention of consultants, manufacturers and other experts necessary for the
council to objectively determine the range of life-cycle costs of such alternatives. No
such consultant, manufacturer or expert shall have any financial interest in, or, in the
twelve months preceding the investigation, have engaged in any business, employment
or professional activity for compensation with a corporation, company, association, joint
stock association, partnership or person, or lessee thereof, owning, leasing, maintaining,
operating, managing or controlling poles, wires, conduits or other fixtures, along public
highways or streets, for the transmission or distribution of electric current for sale for
light, heat or power within the state, or with a person, firm or corporation which manufactures such poles, wires, conduits or other fixtures. The council shall apportion and assess
its expenses for consultants, hearing facilities, stenographic reports and other reasonable
and necessary expenses of conducting such an investigation among those persons, firms
and corporations having gross revenues from the retail sale of electric power in excess
of one hundred thousand dollars during the preceding calendar year. The council shall
assess each such person, firm or corporation in proportion of its gross revenues to the
aggregate gross revenues of all such persons, firms and corporations. Each person, firm
or corporation subject to an assessment shall pay its assessed amount not later than thirty
days after receiving notice of its assessment or as specified by the council. Prior to
incurring expenses for which assessments shall be made under this subsection, the council shall review the anticipated expenses at a public meeting, notice of which shall be
given to each person, firm or corporation subject to an assessment. A person, firm or
corporation may object to an assessment made pursuant to this subsection by filing with
the council, not later than thirty days after receiving notice of its assessment, a petition
stating the amount of the assessment to which it objects and the grounds upon which it
claims such assessment is excessive, erroneous, unlawful or invalid. Upon the request
of the petitioner, the council shall hold a hearing. After reviewing the company's petition
and testimony, if any, the council shall issue an order in accordance with its findings.
The petitioner shall pay the council the amount indicated in the order not later than thirty
days after the date of the order.
(d) The council shall remit all payments received pursuant to this section to the
State Treasurer for deposit in the Siting Council Fund. Such payments shall be accounted
for as expenses recovered from electric power suppliers. All payments made under this
section shall be in addition to any taxes payable to the state under chapters 211, 212,
212a and 219.
(e) An assessment unpaid on the due date or any portion of an assessment withheld
after the due date under this section shall be subject to interest at the rate of one and
one-fourth per cent per month or fraction thereof.
(1971, P.A. 575, S. 13; P.A. 75-486, S. 18, 69; P.A. 76-323, S. 1, 2; P.A. 78-119; P.A. 79-214, S. 4; P.A. 81-439, S. 5,
14; P.A. 82-222, S. 5, 7; P.A. 89-291, S. 7; P.A. 94-176, S. 2; May 25 Sp. Sess. P.A. 94-1, S. 103, 130; P.A. 96-46, S. 2;
P.A. 01-144.)
History: P.A. 75-486 required filing of description of methodology used to arrive at load forecasts; P.A. 76-323 replaced
requirement that report be furnished to "persons listed in subdivision (2)(A) of section 16-50l(b)" with list of persons,
departments, agencies etc. to receive report and added provision re hearings to be held on reports; P.A. 78-119 changed
filing deadline from January to March, replaced 20-year period "next succeeding the date" of report with period "beginning
with the year" of report and added new Subdiv. (2) re data on energy use and peak loads for 5 previous years, renumbering
former Subdivs. (2) to (6), inclusive, accordingly; P.A. 79-214 added Subsec. (b) re simplified statements of loads and
resources by producers using cogeneration technology; P.A. 81-439 excepted private power producers from 10-year forecast requirement, repealed Subsec. (b), eliminating reporting by person producing electricity by cogeneration or use of
renewable fuel resources and added provision requiring report by purchaser of electricity from private power producer
having facility generating more than one megawatt; P.A. 82-222 required forecast report to be furnished only to senate
president, house speaker, energy committee members and other general assembly members requesting it, instead of to all
general assembly members; P.A. 89-291 changed annual report from 10-year to a 20-year forecast of loads and resources;
P.A. 94-176 designated existing provisions as Subsec. (a) and changed reference from Subsec. (f) to Subsec. (j) of Sec.
16-50j and added Subsecs. (b) to (e) re investigation of life-cycle costs for overhead and underground transmission line
alternatives; May 25 Sp. Sess. P.A. 94-1 amended Subsec. (c) by making technical change; P.A. 96-46 amended Subsec.
(a) to allow a forecast report to consist of an update of the previous year's report, to delete requirement that reports be
furnished to certain officials and to add provision re issuance of a report by the council assessing overall status of loads
and resources to certain members of the General Assembly; P.A. 01-144 amended Subsec. (a) to change application of the
subsection from every person engaged in generating electric power to every person engaged in electric transmission,
generation, or distribution services utilizing a generating facility with a capacity of greater than one megawatt, delete
exception for private power producers, delete report content requirements and change the forecast period for the report
from 20 years to 10 years, provide that confidential, proprietary or trade secret information provided under section may
be submitted under a protective order, allow the council to adopt regulations to specify filing requirements for transmitters,
generators, and distributors, require certain information from transmitters, generators, and distributors in the report until
such regulations are adopted, and require the council to review any information submitted under a protective order in an
executive session (Revisor's note: In Subsec. (a), certain references to subdivisions of "this section" were changed editorially by the Revisors to "this subsection" for accuracy).