60300-60301
WATER CODE
SECTION 60300-60301
60300. Not later than the second Tuesday in February each year the board shall order an engineering survey and report to be made regarding the ground water supplies of the district. The same shall include, among all other information and data which the board may require, the following: (1) Records, data and other information for the consideration of the board in its determination of the annual overdraft; (2) Records, data and other information for the consideration of the board in its determination of the accumulated overdraft as of the last day of the preceding water year; (3) A report, with supporting data, as to the total production of ground water from the ground water supplies within the replenishment district during the preceding water year; (4) A report, with supporting data, as to the changes during the preceding water year in the pressure levels or piezometric heights of the ground water contained within pressure-level areas of the replenishment district, and as to the effects thereof upon the ground water supplies within such replenishment district; (5) An estimate of the annual overdraft for the current water year and for the ensuing water year; (6) An estimate of the accumulated overdraft as of the last day of the current water year; (7) An estimate of the total production of ground water from the ground water supplies within the replenishment district for the current water year and for the ensuing water year; (8) An estimate of the changes during the current water year in the pressure levels or piezometric heights of the ground water contained within pressure-level areas of the replenishment district, and of the effects thereof upon the ground water supplies within such replenishment district; (9) An estimate of the quantity, source, and cost of water available for replenishment of the ground water supplies during the ensuing water year under the provisions of Section 60315. 60301. If the district has received an engineering evaluation as to any matter within the powers of the district under Section 60224 and containing proposed action or alternate actions and estimated costs, including engineering and legal fees and expenses and district overhead, the board may, not later than the second Tuesday in February of each year, order the inclusion in the engineering survey and report referred to in Section 60300 of a statement of the proposed action or alternate actions and those estimated costs.