26130-26131

STREETS AND HIGHWAYS CODE
SECTION 26130-26131




26130.  Before the construction of any boulevard and before the
calling of any election for the issuance of bonds, the commission
shall employ one or more engineers who shall make all necessary
surveys, prepare maps showing the location, cross-section and profile
of the proposed boulevard. The engineer shall also prepare
specifications for the construction of the boulevard and estimates of
the cost of construction and of acquiring rights of way.
   These surveys, maps, specifications and estimates shall, upon
approval by the commission, be formally adopted by order entered upon
its minutes and filed with its secretary and when so adopted shall
constitute the plan of the district for the proposed boulevard. The
commission may, at its option, direct the county surveyor, or county
engineer, as the case may be, to do any of the engineering work.



26131.  The expense of making the preliminary surveys may be allowed
by the board of supervisors out of the county general fund or the
general county road fund upon claims regularly presented and allowed
in the manner provided by law.