2710-2719
PUBLIC RESOURCES CODE
SECTION 2710-2719
2710. This chapter shall be known and may be cited as the Surface Mining and Reclamation Act of 1975. 2711. (a) The Legislature hereby finds and declares that the extraction of minerals is essential to the continued economic well-being of the state and to the needs of the society, and that the reclamation of mined lands is necessary to prevent or minimize adverse effects on the environment and to protect the public health and safety. (b) The Legislature further finds that the reclamation of mined lands as provided in this chapter will permit the continued mining of minerals and will provide for the protection and subsequent beneficial use of the mined and reclaimed land. (c) The Legislature further finds that surface mining takes place in diverse areas where the geologic, topographic, climatic, biological, and social conditions are significantly different and that reclamation operations and the specifications therefor may vary accordingly. 2712. It is the intent of the Legislature to create and maintain an effective and comprehensive surface mining and reclamation policy with regulation of surface mining operations so as to assure that: (a) Adverse environmental effects are prevented or minimized and that mined lands are reclaimed to a usable condition which is readily adaptable for alternative land uses. (b) The production and conservation of minerals are encouraged, while giving consideration to values relating to recreation, watershed, wildlife, range and forage, and aesthetic enjoyment. (c) Residual hazards to the public health and safety are eliminated. 2713. It is not the intent of the Legislature by the enactment of this chapter to take private property for public use without payment of just compensation in violation of the California and United States Constitutions. 2714. This chapter does not apply to any of the following activities: (a) Excavations or grading conducted for farming or the immediate excavation or grading of lands affected by a flood or natural disaster for the purpose of restoring those lands to their prior condition. (b) Onsite excavation and onsite earthmoving activities that are an integral and necessary part of a construction project and that are undertaken to prepare a site for construction of structures, landscaping, or other land improvements associated with those structures, including the related excavation, grading, compaction, or the creation of fills, road cuts, and embankments, whether or not surplus materials are exported from the site, subject to all of the following conditions: (1) All required permits for the construction, landscaping, or related land improvements have been approved by a public agency in accordance with applicable provisions of state law and locally adopted plans and ordinances, including, but not limited to, Division 13 (commencing with Section 21000). (2) The lead agency's approval of the construction project included consideration of the onsite excavation and onsite earthmoving activities pursuant to Division 13 (commencing with Section 21000). (3) The approved construction project is consistent with the general plan or zoning of the site. (4) Surplus materials shall not be exported from the site unless and until actual construction work has commenced and shall cease if it is determined that construction activities have terminated, have been indefinitely suspended, or are no longer being actively pursued. (c) Operation of a plant site used for mineral processing, including associated onsite structures, equipment, machines, tools, or other materials, including the onsite stockpiling and onsite recovery of mined materials, subject to all of the following conditions: (1) The plant site is located on lands designated for industrial or commercial uses in the applicable county or city general plan. (2) The plant site is located on lands zoned industrial or commercial, or are contained within a zoning category intended exclusively for industrial activities by the applicable city or county. (3) None of the minerals being processed are being extracted onsite. (4) All reclamation work has been completed pursuant to the approved reclamation plan for any mineral extraction activities that occurred onsite after January 1, 1976. (d) Prospecting for, or the extraction of, minerals for commercial purposes where the removal of overburden or mineral product totals less than 1,000 cubic yards in any one location, and the total surface area disturbed is less than one acre. (e) Surface mining operations that are required by federal law in order to protect a mining claim, if those operations are conducted solely for that purpose. (f) Any other surface mining operations that the board, as defined by Section 2001, determines to be of an infrequent nature and which involve only minor surface disturbances. (g) The solar evaporation of sea water or bay water for the production of salt and related minerals. (h) Emergency excavations or grading conducted by the Department of Water Resources or the Reclamation Board for the purpose of averting, alleviating, repairing, or restoring damage to property due to imminent or recent floods, disasters, or other emergencies. (i) (1) Surface mining operations conducted on lands owned or leased, or upon which easements or rights-of-way have been obtained, by the Department of Water Resources for the purpose of the State Water Resources Development System or flood control, and surface mining operations on lands owned or leased, or upon which easements or rights-of-way have been obtained, by the Reclamation Board for the purpose of flood control, if the Department of Water Resources adopts, after submission to and consultation with, the Department of Conservation, a reclamation plan for lands affected by these activities, and those lands are reclaimed in conformance with the standards specified in regulations of the board adopted pursuant to this chapter. The Department of Water Resources shall provide an annual report to the Department of Conservation by the date specified by the Department of Conservation on these mining activities. (2) Nothing in this subdivision shall require the Department of Water Resources or the Reclamation Board to obtain a permit or secure approval of a reclamation plan from any city or county in order to conduct surface mining operations specified in paragraph (1). Nothing in this subdivision shall preclude the bringing of an enforcement action pursuant to Section 2774.1, if it is determined that a surface mine operator, acting under contract with the Department of Water Resources or the Reclamation Board on lands other than those owned or leased, or upon which easements or rights-of-way have been obtained, by the Department of Water Resources or the Reclamation Board, is otherwise not in compliance with this chapter. (j) (1) Excavations or grading for the exclusive purpose of obtaining materials for roadbed construction and maintenance conducted in connection with timber operations or forest management on land owned by the same person or entity. This exemption is limited to excavation and grading that is conducted adjacent to timber operation or forest management roads and shall not apply to onsite excavation or grading that occurs within 100 feet of a Class One watercourse or 75 feet of a Class Two watercourse, or to excavation for materials that are, or have been, sold for commercial purposes. (2) This exemption shall be available only if slope stability and erosion are controlled in accordance with subdivision (f) of Section 3704 and subdivision (d) of Section 3706 of Title 14 of the California Code of Regulations and, upon closure of the site, the person closing the site implements, where necessary, revegetation measures and postclosure uses in consultation with the Department of Forestry and Fire Protection. (k) Excavations, grading, or other earthmoving activities in an oil or gas field that are integral to, and necessary for, ongoing operations for the extraction of oil or gas that comply with all of the following conditions: (1) The operations are being conducted in accordance with Division 3 (commencing with Section 3000). (2) The operations are consistent with any general plan or zoning applicable to the site. (3) The earthmoving activities are within oil or gas field properties under a common owner or operator. (4) No excavated materials are sold for commercial purposes. 2715. No provision of this chapter or any ruling, requirement, or policy of the board is a limitation on any of the following: (a) On the police power of any city or county or on the power of any city or county to declare, prohibit, and abate nuisances. (b) On the power of the Attorney General, at the request of the board, or upon his own motion, to bring an action in the name of the people of the State of California to enjoin any pollution or nuisance. (c) On the power of any state agency in the enforcement or administration of any provision of law which it is specifically authorized or required to enforce or administer. (d) On the right of any person to maintain at any time any appropriate action for relief against any private nuisance as defined in Part 3 (commencing with Section 3479) of Division 4 of the Civil Code or for any other private relief. (e) On the power of any lead agency to adopt policies, standards, or regulations imposing additional requirements on any person if the requirements do not prevent the person from complying with the provisions of this chapter. (f) On the power of any city or county to regulate the use of buildings, structures, and land as between industry, business, residences, open space (including agriculture, recreation, the enjoyment of scenic beauty, and the use of natural resources), and other purposes. 2715.5. (a) The Cache Creek Resource Management Plan, in conjunction with a site specific plan deemed consistent by the lead agency with the Cache Creek Resource Management Plan, until December 31, 2012, shall be considered to be a functional equivalent of a reclamation plan for the purposes of this chapter. No other reclamation plan shall be required to be reviewed and approved for any excavation project subject to the Cache Creek Resource Management Plan that is conducted in conformance with an approved site specific plan that is consistent with the Cache Creek Resource Management Plan, and the standards specified in that plan governing erosion control, channel stabilization, habitat restoration, flood control, or infrastructure maintenance, if that plan is reviewed and approved by a lead agency pursuant to this chapter. (b) For purposes of this section, the board of supervisors of the county in which the Cache Creek Resource Management Plan is to be implemented shall prepare and file the annual report required to be prepared pursuant to Section 2207. (c) Nothing in this section precludes an enforcement action by the board or the department brought pursuant to this chapter or Section 2207 if the lead agency or the director determines that a surface mining operator, acting under the authority of the Cache Creek Resource Management Plan, is not in compliance with the requirements of this chapter or Section 2207. (d) "Site specific plan," for the purposes of this section, means an individual project plan approved by the lead agency that is consistent with the Cache Creek Resource Management Plan. Site specific plans prepared in conformance with the Cache Creek Resource Management Plan shall, at a minimum, include the information required pursuant to subdivision (c) of Section 2772, shall comply with the requirements of Article 9 (commencing with Section 3700) of Subchapter 1 of Chapter 8 of Division 2 of Title 14 of the California Code of Regulations, and shall be provided along with a financial assurance estimate to the department for review and comment pursuant to Section 2774. Notwithstanding the number of days authorized by paragraph (1) of subdivision (d) of Section 2774, the department shall review the site specific plan and the financial assurance estimate and prepare any written comments within 15 days from the date of receipt of the plan and the estimate. (e) Prior to engaging in an excavation activity in conformance with the Cache Creek Resource Management Plan, a surface mining operation shall be required to obtain financial assurances that meet the requirements of Section 2773.1. (f) This section shall not become operative until the date the State Mining and Geology Board notifies the Secretary of State in writing that the board has approved an ordinance adopted by the Board of Supervisors for the County of Yolo that governs in-channel noncommercial extraction activities carried out pursuant to the Cache Creek Resources Management Plan. (g) This section shall remain in effect only until December 31, 2012, and as of that date is repealed, unless a later enacted statute that is enacted before December 31, 2012, deletes or extends that date. 2716. (a) Any interested person may commence an action on his or her own behalf against the board, the lead agency, the State Geologist, or the director for a writ of mandate pursuant to Chapter 2 (commencing with Section 1084) of Title 1 of Part 3 of the Code of Civil Procedure to compel the board, the State Geologist, or the director to carry out any duty imposed upon them pursuant to this chapter. (b) For purposes of this section, "person" means an individual, firm, association, corporation, organization, or partnership, or a city, county, district, or the state or any department or agency of the state. 2717. (a) The board shall submit to the Legislature on December 1st of each year a report on the actions taken pursuant to this chapter during the preceding fiscal year. The report shall include a statement of the actions, including legislative recommendations, that are necessary to carry out more completely the purposes and requirements of this chapter. (b) For purposes of ensuring compliance with Sections 10295.5 and 20676 of the Public Contract Code, the department shall, at a minimum, quarterly publish in the California Regulatory Notice Register, or otherwise make available upon request to the Department of General Services or any other state or local agency, a list identifying all of the following: (1) Surface mining operations for which a report is required and has been submitted pursuant to Section 2207 that indicates all of the following: (A) The reclamation plan and financial assurances have been approved pursuant to this chapter. (B) Compliance with state reclamation standards developed pursuant to Section 2773. (C) Compliance with the financial assurance guidelines developed pursuant to Section 2773.1. (D) The annual reporting fee has been submitted to the Department of Conservation. (2) Surface mining operations for which an appeal is pending before the board pursuant to subdivision (e) of Section 2770, provided that the appeal shall not have been pending before the board for more than 180 days. (3) Surface mining operations for which an inspection is required and for which an inspection notice has been submitted by the lead agency pursuant to Section 2774 that indicates both compliance with the approved reclamation plan and that sufficient financial assurances, pursuant to Section 2773.1, have been approved and secured. 2718. If any provision of this chapter or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of the chapter which can be given effect without the invalid provision or application, and to this end the provisions of this chapter are severable. 2719. Notwithstanding any other provision of law, neither the state nor any county, city, district, or other political subdivision shall be exempt from any fee imposed upon a mining operation pursuant to subdivision (d) of Section 2207.