Sec. 09.45.887. - Court action allowed after failure to repair or to settle.
If the construction professional does not respond within the time required by AS 09.45.886 , does not repair the defect to the satisfaction of the claimant within the time agreed under AS 09.45.886(1), does not provide an offer under AS 09.45.886 (2), or serves a statement under AS 09.45.886 (3), the claimant may bring an action against the construction professional for the claim described in the notice of claim without further notice.