1753.93—Responsibilities.
(a) Responsibilities transferred to certification borrowers.
(1)
Approval of engineering and architectural service contracts.
(5)
Approval of FAP's if RUS has approved the force account method of construction for the construction project.
(b) Responsibilities retained by RUS.
(1)
Approval to deviate from RUS requirements, except as provided in (a) above.
(2)
Approval of use of loan funds for projects other than those included in the loan construction budget. See 7 CFR part 1744 subpart C.
(7)
Approval to use materials not listed in the List of Materials Acceptable for Use on Telephone Systems of RUS Borrowers.