1753.79—Construction by force account.
The borrower shall require that:
(a)
Minor construction by the force account method be supervised by a competent foreman. The work shall be performed in accordance with all regulatory and safety codes.
(b)
Daily time and material reports, referenced by the work project number, shall be kept to record labor and materials used as construction is performed.