SUBPART G—Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers (§1717.300 to §1717.310-1717.349)
- 1717.300—Purpose.
- 1717.301—Policy.
- 1717.302—Definitions and rules of construction.
- 1717.303—Requirements of RUS documents.
- 1717.304—State regulatory authority rate jurisdiction.
- 1717.305—Pre-emption.
- 1717.306—RUS required rates.
- 1717.307—Distribution members' rates.
- 1717.308—RUS approval of nonconforming rates.
- 1717.309—Additional statutory pre-emption.