194.105—Worst case discharge.

Prevention measure Standard Credit(percent)
Secondary containment > 100% NFPA 30 50
Built/repaired to API standards API STD 620/650/653 10
Overfill protection standards API RP 2350 5
Testing/cathodic protection API STD 650/651/653 5
Tertiary containment/drainage/treatment NFPA 30 5
Maximum allowable credit 75
[58 FR 253, Jan. 5, 1993, as amended by Amdt. 194-3, 63 FR 37505, July 13, 1998; Amdt. 194-4, 70 FR 8747, Feb. 23, 2005; Amdt. 194-5, 70 FR 35042, June 16, 2005]