193.2621—Testing transfer hoses.
Hoses used in LNG or flammable refrigerant transfer systems must be:
(a)
Tested once each calendar year, but with intervals not exceeding 15 months, to the maximum pump pressure or relief valve setting; and
(b)
Visually inspected for damage or defects before each use.