173.22—Shipper's responsibility.

(2) The person shall determine that the packaging or container is an authorized packaging, including part 173 requirements, and that it has been manufactured, assembled, and marked in accordance with:
(i) Section 173.7(a) and parts 173, 178, or 179 of this subchapter;
(b) No person may offer a motor carrier any hazardous material specified in 49 CFR 385.403 unless that motor carrier holds a safety permit issued by the Federal Motor Carrier Safety Administration.
(c) Prior to each shipment of fissile radioactive materials, and Type B or highway route controlled quantity packages of radioactive materials (see § 173.403 ), the shipper shall notify the consignee of the dates of shipment and expected arrival. The shipper shall also notify each consignee of any special loading/unloading instructions prior to his first shipment. For any shipment of irradiated reactor fuel, the shipper shall provide physical protection in compliance with a plan established under:
[Amdt. 173-100, 42 FR 2689, Jan. 13, 1977]

Code of Federal Regulations

Editorial Note: For Federal Register citations affecting § 173.22 , see the List of CFR Sections Affected which appears in the Finding Aids section of the printed volume and on GPO Access.