90.205—Power and antenna height limits.
Applicants for licenses must request and use no more power than the actual power necessary for satisfactory operation. Except where otherwise specifically provided for, the maximum power that will be authorized to applicants whose license applications for new stations are filed after August 18, 1995 is as follows:
(a) Below 25 MHz.
For single sideband operations (J3E emission), the maximum transmitter peak envelope power is 1000 watts.
(c) 72-76 MHz.
The maximum effective radiated power (ERP) for stations operating on fixed frequencies is 300 watts. Stations operating on mobile-only frequencies are limited to one watt transmitter output power.
(d) 150-174 MHz.
(1)
The maximum allowable station ERP is dependent upon the station's antenna HAAT and required service area and will be authorized in accordance with table 1. Applicants requesting an ERP in excess of that listed in table 1 must submit an engineering analysis based upon generally accepted engineering practices and standards that includes coverage contours to demonstrate that the requested station parameters will not produce coverage in excess of that which the applicant requires.
(2)
Applications for stations where special circumstances exist that make it necessary to deviate from the ERP and antenna heights in Table 1 will be submitted to the frequency coordinator accompanied by a technical analysis, based upon generally accepted engineering practices and standards, that demonstrates that the requested station parameters will not produce a signal strength in excess of 37 dBu at any point along the edge of the requested service area. The coordinator may then recommend any ERP appropriate to meet this condition.
(3)
An applicant for a station with a service area radius greater than 40 km (25 mi) must justify the requested service area radius, which will be authorized only in accordance with table 1, note 4. For base stations with service areas greater than 80 km, all operations 80 km or less from the base station will be on a primary basis and all operations outside of 80 km from the base station will be on a secondary basis and will be entitled to no protection from primary operations.
Service area radius (km) | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
3 | 8 | 13 | 16 | 24 | 32 | 40 | 48 4 | 64 4 | 80 4 | |
Maximum ERP (w) 1 | 1 | 28 | 178 | 2 500 | 2 500 | 2 500 | 500 | 2 500 | 2 500 | 2 500 |
Up to reference HAAT (m) 3 | 15 | 15 | 15 | 15 | 33 | 65 | 110 | 160 | 380 | 670 |
1 Maximum ERP indicated provides for a 37 dBu signal strength at the edge of the service area per FCC Report R-6602, Fig. 19 (See § 73.699 , Fig. 10). | ||||||||||
2 Maximum ERP of 500 watts allowed. Signal strength at the service area contour may be less than 37 dBu. | ||||||||||
3 When the actual antenna HAAT is greater than the reference HAAT, the allowable ERP will be reduced in accordance with the following equation: ERPallow = ERPmax × (HAATref / HAATactual) 2. | ||||||||||
4 Applications for this service area radius may be granted upon specific request with justification and must include a technical demonstration that the signal strength at the edge of the service area does not exceed 37 dBu. |
(h) 450-470 MHz.
(1)
The maximum allowable station effective radiated power (ERP) is dependent upon the station's antenna HAAT and required service area and will be authorized in accordance with table 2. Applicants requesting an ERP in excess of that listed in table 2 must submit an engineering analysis based upon generally accepted engineering practices and standards that includes coverage contours to demonstrate that the requested station parameters will not produce coverage in excess of that which the applicant requires.
(2)
Applications for stations where special circumstances exist that make it necessary to deviate from the ERP and antenna heights in Table 2 will be submitted to the frequency coordinator accompanied by a technical analysis, based upon generally accepted engineering practices and standards, that demonstrates that the requested station parameters will not produce a signal strength in excess of 39 dBu at any point along the edge of the requested service area. The coordinator may then recommend any ERP appropriate to meet this condition.
(3)
An applicant for a station with a service area radius greater than 32 km (20 mi) must justify the requested service area radius, which may be authorized only in accordance with table 2, note 4. For base stations with service areas greater than 80 km, all operations 80 km or less from the base station will be on a primary basis and all operations outside of 80 km from the base station will be on a secondary basis and will be entitled to no protection from primary operations.
Service area radius (km) | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
3 | 8 | 13 | 16 | 24 | 32 | 40 4 | 48 4 | 64 4 | 80 4 | |
Maximum ERP (w) 1 | 2 | 100 | 2 500 | 2 500 | 2 500 | 2 500 | 2 500 | 2 500 | 2 500 | 2 500 |
Up to reference HAAT (m) 3 | 15 | 15 | 15 | 27 | 63 | 125 | 250 | 410 | 950 | 2700 |
1 Maximum ERP indicated provides for a 39 dBu signal strength at the edge of the service area per FCC Report R-6602, Fig. 29 (See § 73.699 , Fig. 10 b). | ||||||||||
2 Maximum ERP of 500 watts allowed. Signal strength at the service area contour may be less than 39 dBu. | ||||||||||
3 When the actual antenna HAAT is greater than the reference HAAT, the allowable ERP will be reduced in accordance with the following equation: ERPallow = ERPmax × (HAATref / HAATactual) 2. | ||||||||||
4 Applications for this service area radius may be granted upon specific request with justification and must include a technical demonstration that the signal strength at the edge of the service area does not exceed 39 dBu. |
(j) 763-775 MHz and 793-805 MHz.
Power and height limitations are specified in §§ 90.541 and 90.542.
(k) 806-824 MHz, 851-869 MHz, 896-901 MHz and 935-940 MHz.
Power and height limitations are specified in § 90.635
(l) 902-928 MHz.
LMS systems operating pursuant to subpart M of this part in the 902-927.25 MHz band will be authorized a maximum of 30 watts ERP. LMS equipment operating in the 927.25-928 MHz band will be authorized a maximum of 300 watts ERP. ERP must be measured as peak envelope power. Antenna heights will be as specified in § 90.353(h).
(r) All other frequency bands.
Requested transmitter power will be considered and authorized on a case by case basis.
(s)
The output power shall not exceed by more than 20 percent either the output power shown in the Radio Equipment List [available in accordance with § 90.203(a)(1)] for transmitters included in this list or when not so listed, the manufacturer's rated output power for the particular transmitter specifically listed on the authorization.
[60 FR 37262, July 19, 1995, as amended at 62 FR 2039, Jan. 15, 1997; 63 FR 58651, Nov. 2, 1998; 64 FR 66409, Nov. 26, 1999; 67 FR 41860, June 20, 2002; 68 FR 38639, June 30, 2003; 69 FR 46443, Aug. 3, 2004; 72 FR 48860, Aug. 24, 2007]