91.55-5—Plans and specifications required for new construction.
(2)
General Arrangement Plan of decks, holds, inner bottoms, etc., and including inboard and outboard profile.
Code of Federal Regulations
Footnote(s): 1 The asterisk (*) indicates items which may require approval by the American Bureau of Shipping for vessels classed by that society.
(13)
*Arrangement of the cargo gear including a stress diagram. The principal details of the gear and the safe working load for each component part shall be shown.
(d) Fire control.
(1)
General arrangement plans showing for each deck the control stations, the various fire sections enclosed by fire resisting bulkheads, the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to different compartments and decks and the ventilation system including location of ventilation shutdowns, positions of dampers and the numbers identifying each system.
(4)
Details of extinguishing systems, including fire mains, carbon dioxide, foam and sprinkling systems.
(e) Marine engineering.
For plans required for marine engineering equipment and systems, see subchapter F (Marine Engineering) of this chapter.
(f) Electrical engineering.
For plans required for electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter.
(g) Lifesaving equipment.
(1)
These plans are to show the location and arrangement of embarkation decks, all overboard discharges and projections in way of launching lifeboats, weights of lifeboats fully equipped and loaded, working loads of davits and winches, types and sizes of falls, the manufacturer's name and identification for all equipment, and all other relevant and necessary information.
(h) Crew's accommodations.
(1)
Arrangement plans showing accommodations, ventilation, escapes, hospital, and sanitary facilities for all crewmembers.
(i) Navigation bridge visibility.
For vessels of 100 meters (328 feet) or more in length contracted for on or after September 7, 1990, a plan must be included which shows how visibility from the navigation bridge will meet the standards contained in § 92.03-1 of this subchapter.
[CGFR 65-50, 30 FR 16974, Dec. 30, 1965, as amended by CGD 79-023, 48 FR 51008, Nov. 4, 1983; CGD 85-099, 55 FR 32248, Aug. 8, 1990; CGD 85-099, 55 FR 40260, Oct. 2, 1990; CGD 88-032, 56 FR 35825, July 29, 1991; 56 FR 46354, Sept. 11, 1991]