58.30-40—Plans.
(a)
Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and must include the following:
[CGD 73-254, 40 FR 40168, Sept. 2, 1975]