SUBPART 52.01—General Requirements (§52.01-1 to §52.01-145)
- 52.01-1—Incorporation by reference.
- 52.01-2—Adoption of section I of the ASME Boiler and Pressure Vessel Code.
- 52.01-3—Definitions of terms used in this part.
- 52.01-5—Plans.
- 52.01-10—Automatic controls.
- 52.01-35—Auxiliary, donkey, fired thermal fluid heater, and heating boilers.
- 52.01-40—Materials and workmanship.
- 52.01-50—Fusible plugs (modifies A-19 through A-21).
- 52.01-55—Increase in maximum allowable working pressure.
- 52.01-90—Materials (modifies PG-5 through PG-13).
- 52.01-95—Design (modifies PG-16 through PG-31 and PG-100).
- 52.01-100—Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55).
- 52.01-105—Piping, valves and fittings (modifies PG-58 and PG-59).
- 52.01-110—Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60).
- 52.01-115—Feedwater supply (modifies PG-61).
- 52.01-120—Safety valves and safety relief valves (modifies PG-67 through PG-73).
- 52.01-130—Installation.
- 52.01-135—Inspection and tests (modifies PG-90 through PG-100).
- 52.01-140—Certification by stamping (modifies PG-104 through PG-113).
- 52.01-145—Manufacturers' data report forms (modifies PG-112 and PG-113).