162.050-1—Scope.

(a) This subpart contains—
(1) Procedures for approval of 15 ppm separators, oil content meters, and bilge alarms.
(2) Design specifications for this equipment;
(3) Tests required for approval;
(4) Procedures for obtaining designation as a facility authorized to conduct approval tests;
(5) Marking requirements; and
(6) Factory inspection procedures.
(b) [Reserved]
[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3382, Jan. 16, 2009]