153.408—Tank overflow control.
(a)
When table 1 references this section, a cargo containment system must have a cargo high level alarm meeting § 153.409 and one of the following additional systems:
(d)
A tank overflow must be identified with the legend “TANK OVERFLOW ALARM” in lettering as specified for the warning sign in § 153.955.
(e)
A tank overflow alarm must be audible and visible in that part of the deck where the containment systems are located and at the point where cargo loading is controlled on the tankship.
(f)
The automatic shutdown system or tank overflow alarm must be able to be checked at the tank for proper operation (for example, by electrically simulating an overfill at the tank gauge connection).
(g)
In this section, “independent” as applied to two systems means that one system will operate with a failure of any part of the other system except high level power sources and electrical feeder panels. Conduit need not be independent; the control wiring for several independent systems may be carried in a single conduit.
[CGD 81-078, 50 FR 21173, May 22, 1985]