13.127—Service: General.

(a) A service letter must be signed by the owner, operator, master, or chief engineer of the vessel and must specify—
(1) The classification of cargo (DL, LG, or, for a restricted endorsement, a specific product) handled while the applicant accumulated the service;
(2) The dates, the number and kinds of transfers the applicant has participated in, and the number of transfers that involved commencement or completion; and
(3) That the applicant has demonstrated to the satisfaction of the signer that he or she is fully capable of supervising transfers of liquid cargo, including
(i) Pre-transfer inspection;
(ii) Pre-transfer conference and execution of the Declaration of Inspection;
(iii) Connection of cargo hoses or loading-arms;
(iv) Line-up of the cargo system for loading and discharge;
(v) Start of liquid flow during loading;
(vi) Start of cargo pump and increase of pressure to normal discharge pressure;
(vii) Calculation of loading-rates;
(viii) Monitoring;
(ix) Topping-off of cargo tanks during loading;
(x) Stripping of cargo tanks;
(xi) Ballasting and deballasting, if appropriate;
(xii) Disconnection of the cargo hoses or loading-arms; and
(xiii) Securing of cargo systems.
(b) In determining the numbers and kinds of transfers that the applicant has participated in under paragraph (a)(2) of this section, the following rules apply:
(1) A transfer must involve the loading or discharge from at least one of the vessel's cargo tanks to or from a shore facility or another vessel. A shift of cargo from one tank to another tank is not a transfer for this purpose.
(2) Regardless of how long the transfer lasts beyond four hours, it counts as only one transfer.
(3) A transfer must include both a commencement and a completion.
(4) Regardless of how many tanks or products are being loaded or discharged at the same time, a person may receive credit for only one transfer, one loading, and one discharge a watch.
(5) Credit for a transfer during a watch of less than four hours accrues only if the watch includes either the connection and the commencement of transfer or the completion of transfer and the disconnection.
(6) Credit for a commencement of loading accrues only if the applicant participates in the pre-transfer inspection, the pre-transfer conference including execution of the Declaration of Inspection, the connection of cargo hoses or loading-arms, the line-up of the cargo system for the loading, the start of liquid flow, and the calculation of loading-rates, where applicable.
(7) Credit for a commencement of discharge accrues only if the applicant participates in the pre-transfer inspection, the pre-transfer conference including execution of the Declaration of Inspection, the connection of cargo hoses or loading-arms, the line-up of the cargo system for the discharge, the start of the cargo pump or pumps and increase of pressure to normal pressure for discharge, and the monitoring of discharge rates.
(8) Credit for a completion of transfer, whether loading or discharge, accrues only if the applicant participates in the topping-off at the loading port, or in the stripping of cargo tanks and the commencement of ballasting, if required by the vessel's transfer procedures, at the discharge port.
(9) Personnel desiring credit for transfers during off-duty hours may satisfy requirements of competence through incremental training periods that include segments of transfers. The cumulative number of transfers must equal the minimum specified in § 13.203(b) or 13.303(b).
[CGD 79-116, 60 FR 17142, Apr. 4, 1995, as amended by CGD 79-116, 62 FR 25133, May 8, 1997]