116.202—Plans and information required.
(a)
Except as provided in § 116.210 of this part, the owner of a vessel requesting initial inspection for certification must, prior to the start of construction, submit for approval three copies of the following plans. The plans may be delivered by visitors to Commanding Officer, U.S. Coast Guard Marine Safety Center, 1900 Half Street, SW, Suite 1000, Room 525, Washington, DC 20024, or transmitted by mail to: Commanding Officer, U.S. Coast Guard Marine Safety Center, 2100 2nd St. SW., Stop 7102, Washington, DC 20593-7102, in a written or electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ/MSC.
(b)
In addition, the owner shall, prior to receiving a Certificate of Inspection, submit for approval to the Marine Safety Center, three copies of the following plans, manuals, analyses, and calculations that are applicable to the vessel as determined by the Commanding Officer, Marine Safety Center:
(3)
Fire load calculations of accommodations and service spaces, if required in § 116.427 of this part ;
(4)
Emergency evacuation plan required in § 116.520, of this part with drawings showing embarkation stations, areas of refuge, and escape routes;
(vi)
Power, lighting, and interior communication panelboards with number of circuits and rating of energy consuming devices;
(viii)
Rating of circuit breakers and switches, interrupting capacity of circuit breakers, and rating and setting of overcurrent devices;
(x)
For a vessel of more than 19.8 meters (65 feet) in length with overnight accommodations for more than 49 passengers, an overcurrent protective device coordination analysis if the information required by paragraph (a)(8)(i) through (a)(8)(ix) of this section is not considered adequate by the Commanding Officer, Marine Safety Center to review the electrical system of the vessel;
(10)
Piping systems including: bilge, ballast, hydraulic, sanitary, compressed air, combustible and flammable liquids, vents, soundings, and overflows;
(13)
Lines and offsets, curves of form, cross curves of stability, and tank capacities including size and location on vessel; and
(ii)
Rigging plan showing sail areas and centers of effort as well as the arrangement, dimensions, and connections of the standing rigging.
(c)
For a vessel, the construction of which was begun prior to approval of the plans and information required by paragraphs (a) and (b) of this section, the cognizant OCMI may require any additional plans and information, manufacturers' certifications of construction, testing including reasonable destructive testing, and inspections, which the OCMI determines are necessary to verify that the vessel complies with the requirements of this subchapter.
[CGD 85-080, 61 FR 900, Jan. 10, 1996; 61 FR 24464, May 15, 1996; USCG-2007-29018, 72 FR 53966, Sept. 21, 2007; USCG-2009-0702, 74 FR 49234, Sept. 25, 2009]