112.05-3—Main-emergency bus-tie.
Each bus-tie between a main switchboard and an emergency switchboard must:
(b)
Be arranged to prevent parallel operation of an emergency power source with any other source of electric power, except for interlock systems for momentary transfer of loads; and
(c)
If arranged for feedback operation, open automatically upon overload of the emergency power source before the emergency power source is tripped off the line from the overload.