110.25-3—Procedure for submitting plans.

(a) The plans required by § 110.25-1 must be submitted to one of the following Coast Guard offices:
(1) By visitors to the Commanding Officer, U.S. Coast Guard Marine Safety Center, 1900 Half Street, SW., Suite 1000, Room 525, Washington, DC 20024, or by mail to: Commanding Officer, U.S. Coast Guard Marine Safety Center, 2100 2nd St. SW., Stop 7102, Washington, DC 20593-7102, in a written or electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ/MSC.
(2) The Officer in Charge, Marine Inspection at or nearest the place where the vessel is to be built.
(b) [Reserved]
(c) Three copies of each plan are required so that one can be returned to the submitter. If the submitter desires additional copies of approved plans, he should submit enough for the necessary distribution.

Code of Federal Regulations

Note: The Coast Guard and the American Bureau of Shipping (ABS) coordinate plan review for vessels classed by the ABS in order to eliminate duplication of effort. An applicant for plan review of a vessel that is classed by the ABS should consult Commanding Officer, Marine Safety Center, to determine applicable procedures for submitting plans.
[CGD 74-125A, 47 FR 15232, Apr. 8, 1982]

Code of Federal Regulations

Editorial Note: For Federal Register citations affecting § 110.25-3 , see the list of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and on GPO Access.

Code of Federal Regulations

Editorial Note: By CGD 96-041, 61 FR 50730, Sept. 27, 1996, paragraph (a)(1) of § 110.25-3 was amended by removing the word “(G-MSC)”. However, by CGD 94-108, 61 FR 28275, June 4, 1996, the word “(G-MSC)” was removed and the word “(MSC)” was added in its place.