PART 418—OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA
- 418.1—Definitions.
- 418.2—How Project water may be used.
- 418.3—Effect of these regulations on water rights.
- 418.4—Prohibited deliveries.
- 418.5—Responsibility for violations.
- 418.6—Fallon Paiute-Shoshone Indian Reservation.
- 418.7—Who may receive irrigation deliveries.
- 418.8—Types of eligible land.
- 418.9—Reporting changes in eligible land.
- 418.10—Determining the amount of water duty to be delivered.
- 418.11—Valid headgate deliveries.
- 418.12—Project efficiency.
- 418.13—Maximum allowable limits.
- 418.14—Recordkeeping requirements.
- 418.15—Operations monitoring.
- 418.16—Using water for power generation.
- 418.17—Truckee and Carson River water use.
- 418.18—Diversions at Derby Dam.
- 418.19—Diversions from the Truckee River to the Truckee Division.
- 418.20—Diversions from the Truckee River to Lahontan Reservoir, January through June.
- 418.21—Diversion of Truckee River water to Lahontan Reservoir, July through December.
- 418.22—Future adjustments to Lahontan Reservoir storage targets.
- 418.23—Diversion of Rock Dam Ditch water.
- 418.24—Precautionary drawdown and spills from Lahontan Reservoir.
- 418.25—Water use for other than Newlands Project purposes.
- 418.26—Charges for water use.
- 418.27—Distribution system operation.
- 418.28—Conditions of delivery.
- 418.29—Project management.
- 418.30—Provisions required in future contracts.
- 418.31—Conservation measures.
- 418.32—Cooperative programs.
- 418.33—Purpose of the implementation strategy.
- 418.34—Valid headgate deliveries.
- 418.35—Efficiencies.
- 418.36—Incentives for additional long term conservation.
- 418.37—Disincentives for lower efficiency.
- 418.38—Maximum allowable diversion.