SUBPART D—Feasibility Studies (§404.47 to §404.52)
- 404.47—How will a feasibility study be conducted under this program?
- 404.48—What process will Reclamation follow to determine if a feasibility study is ready for review?
- 404.49—What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?
- 404.50—What information will be included in the feasibility report prepared by Reclamation.
- 404.51—Are proposed projects under the Rural Water Supply Program reviewed by the Administration?
- 404.52—Who will the feasibility report be provided to?