86.1530—Test sequence; general requirements.
Preparation
Warm-up (or Emission Test)
Preconditioning, 30 seconds minimum, six minutes maximum
Idle Stabilization, 30±5 seconds
Idle Emission Sampling, one minute minimum, six minutes maximum
These steps are described by subsequent procedures.
(b)
Ambient test cell conditions during the test shall be those specified in § 86.130-78 or 40 CFR part 1065, subpart F.