52.2299—Original identification of plan section.
(a)
This section identifies the original “Texas Air Pollution Control Implementation Plan” and all revisions submitted by Texas that were federally approved prior to December 31, 1998.
(1)
Certification that statewide public hearings had been held on the plan was submitted by the Texas Air Control Board (TACB) on February 8, 1972. (Nonregulatory)
(2)
A discussion of its policy concerning the confidentiality of certain hydrocarbon emission data was submitted by the TACB on May 2, 1972. (Nonregulatory)
(3)
A discussion of the source surveillance and extension sections of the plan was submitted by the TACB on May 3, 1972. (Nonregulatory)
(4)
A discussion of minor revisions to the plan was submitted by the Governor on July 31, 1972. (Nonregulatory)
(5)
Revisions of section XI, paragraph C.3: Rule 9: Regulation V and control strategy for photochemical oxidants/hydrocarbons in Texas designated regions 7 and 10; regulation VII; and control strategy for nitrogen oxides in regions 5, 7, and 8 were submitted by the TACB on August 8, 1972.
(6)
A request that inconsistencies in the plan concerning the attainment dates of primary air standards be corrected was submitted by the Governor on November 10, 1972. (Nonregulatory)
(7)
Revisions to regulation IV, regulation V, the general rules and control strategy for photochemical oxidants/hydrocarbons, and a request for a two year extension to meet Federal standards for photochemical oxidants was submitted by the Governor on April 13, 1973.
(8)
Revisions to regulation IV (Control of Air Pollution from Motor Vehicles) were adopted on October 30, 1973, and were submitted by the Governor on December 11, 1973.
(9)
A revision of priority classifications for particulate matter, sulfur oxides, and carbon monoxide was submitted by the Governor on March 21, 1975. (Nonregulatory)
(10)
Revisions to rule 23, concerning compliance with new source performance standards, and rule 24, concerning compliance with national emission standards for hazardous air pollutants were submitted by the Governor on May 9, 1975.
(11)
Administrative revisions were submitted by the TACB with the semi-annual report in 1974 for sections I, II, III, IV, XI and XIII, and with the semi-annual report in 1975 for sections I, II, XI, and XII. (Nonregulatory)
(12)
A revision of section IX, Air Quality Surveillance, was submitted by the Governor on August 2, 1976. (Nonregulatory)
(13)
Revisions to section IX, Air Quality Surveillance Plan, which include changes of several air quality monitoring sites, were submitted by the TACB on August 12, 1977. (Nonregulatory)
(14)
Administrative revisions to section X, the Permit System, were submitted by the TACB in 1973, 1974, 1975, and 1977. (Nonregulatory)
(15)
Revisions to regulation V for control of volatile carbon compound emissions, as amended on December 10, 1976, were submitted by the Governor on July 20, 1977.
(16)
An administrative revision to section IX, Air Quality Surveillance System, was submitted by the Texas Air Control Board on August 14, 1978. (Nonregulatory)
(17)
Board Order No. 78-6, creditable as emission offsets for the Corpus Christi Petrochemical Company project in Corpus Christi, was submitted by the Governor on July 24, 1978, as amendments to the Texas State Implementation Plan (see § 52.2275 ).
(18)
Draft inspection/maintenance legislation and a schedule for conducting a pilot inspection/maintenance study were submitted by the Governor on April 13, 1979.
(19)
Adopted inspection/maintenance legislation and administrative revisions concerning inspection/maintenance were submitted by the Governor on August 9, 1979.
(20)
Revision to the plan for attainment of standards for particulate matter, carbon monoxide, and ozone (Part D requirements) were submitted by the Governor on April 13, 1979.
Code of Federal Regulations
(21)
Administrative revisions to the transportation control portion of the plan were submitted by the Governor on August 9, 1979 (non-regulatory).
(22)
No action is being taken on Subchapters 131.07.52, .53, and .54 of Regulation V, submitted by the Governor April 13, 1979 for the ozone nonattainment counties of Harris, Galveston, Brazoria, Bexar, Dallas, and Tarrant.
(23)
No action is being taken on the control strategy for the TSP nonattainment area of Houston 1, submitted by the Governor on April 13, 1979.
(24)
A revision identifying and committing to implement currently planned Transportation Control Measures (TCMs) for Harris County was submitted by the Governor on December 28, 1979.
(25)
Revisions to Regulation VI (i.e., Subchapter 116.3(a)(13-15)), and the definition of “de minimus impact,” were adopted by the Texas Air Control Board on July 11, 1980, and submitted by the Governor on July 25, 1980.
(26)
Board Order No. 78-8 creditable as emission offsets for the General Portland, Inc., project in New Braunfels, Comal County, Texas, was submitted by the Governor on September 13, 1978, as an amendment to the Texas State Implementation Plan (see § 52.2276 ).
(27)
Revisions to Regulation V (i.e., Subchapters 115.171-176) and particulate matter (TSP) control strategies for the nonattainment areas of San Benito, Brownsville, Corpus Christi 1, Corpus Christi 2, Dallas 1, and El Paso 4 were adopted by the Texas Air Control Board on July 11, 1980, and submitted by the Governor on July 25, 1980.
(28)
An administrative revision to section I, Introduction, was submitted by the TACB on July 23, 1981. (Nonregulatory)
(29)
An administrative revision to section V, Legal Authority, was submitted by the TACB on July 23, 1981. (Nonregulatory).
(30)
Revisions to the Texas SIP for the Union Carbide Corporation Bubble in Texas City, Texas were submitted by the Governor on December 15, 1981.
(31)
Revisions to the ozone, total suspended particulate, and carbon monoxide control strategies, General Rules (i.e., definition for vapor mounted seal and section 101.22 ), Regulation IV (i.e., addition of section 114.2(b) ), and Regulation V (i.e., deletion of sections 115.46 and 115.71, 115.101-106, sections 115.144, 115.153, title of sections 115.161-163 and 115.162, 115.171-176, 115.191-194, sections 115.252, 115.262, 115.401, 115.411, and title of sections 115.421-424) were adopted by the Texas Air Control Board on March 20, 1981, and submitted by the Governor on July 20, 1981.
(32)
Revisions to the plan for intergovernmental consultation and composition of the Texas Air Control Board were submitted by the Governor on April 13, 1979.
(33)
A revision to General Rule 9—Sampling, as adopted by the Texas Air Control Board on October 30, 1973, was submitted by the Governor on December 11, 1973.
(34)
Revisions to the General Rules (i.e., the addition of definitions for liquid-mounted seal, miscellaneous metal parts and products, factory surface coating of flat wood paneling, vapor tight, and waxy high pour point crude oil) and Regulation V (i.e., sections 115.101-106, section 115.191 (9) and (10), sections 115.193, 115.194, 115.201-203, 115.221-223, 115.231-233, 115.251-255, 115.261-264, and 115.421-424) were adopted by the Texas Air Control Board on July 11, 1980 and submitted by the Governor on July 25, 1980.
(36)
Revisions to Regulation VI (i.e., section 116.1, section 116.2, section 116.3(a), section 116.3(a)(2), the addition of sections 116.3(a)(3), 116.3(a)(4), and 116.3(a)(5), section 116.3(a)(6), section 116.3(b)(2), the addition of sections 116.3(b)(3), 116.3(b)(4), 116.4, and 116.5, section 116.6, section 116.7, and section 116.8) were adopted by the Texas Air Control Board on March 27, 1975 and submitted by the Governor on May 9, 1975.
(37)
Revisions to Regulation VI (i.e., the deletion of 131.08.00.009) were adopted by the Texas Air Control Board on March 30, 1979 and submitted by the Governor on April 13, 1979.
(38)
Revisions to Regulation VI (i.e., the deletion of 131.08.00.003(a)(3) and 131.08.00.003(a)(5), section 116.3(a)(4), section 116.3(a)(5), section 116.3(a)(9), section 116.3(a)(10), section 116.3(a)(12), and section 116.10) were adopted by the Texas Air Control Board on March 20, 1981 and submitted by the Governor on July 20, 1981.
(40)
Revisions to Subchapter 115.135 (formerly 131.07.54.105) of Regulation V were adopted by the Texas Air Control Board on September 7, 1979 and submitted by the Governor to EPA on November 2, 1979 (i.e., removal of Jefferson, Orange, El Paso, Nueces, and Travis Counties).
(41)
The Texas Lead SIP was submitted to EPA on June 12, 1980, by the Governor of Texas, as adopted by the Texas Air Control Board on March 21, 1980. Additional information was submitted in letters dated January 29, 1982, March 15, 1982, June 3, 1982, June 15, 1982, August 23, 1982, and October 14, 1982. Also additional information and Board Order 82-11 were submitted in a letter dated December 3, 1982. No action is taken regarding the Dallas and El Paso areas.
(42)
An administrative revision for Section VIII (Texas Air Pollution Emergency Episode Contingency Plan) and a revision to Regulation VIII (Control of Air Pollution Episodes) was submitted by the TACB on May 18, 1982 and December 29, 1981, respectively.
(43)
A revision to Regulation V deleting Ector County from the provisions of sub sections 115.111 and .113 was adopted on March 20, 1981 and submitted by the Governor on July 20, 1981.
(44)
Revisions to Regulation I, sections 111.2(7), 111.3, 111.11, 111.12, 111.26, 111.61-111.65, and 111.71-111.76, for control of particulate matter and visible emissions as submitted by the Governor on January 22, 1974.
(45)
Revisions to Regulation I, section 111.2 for control of particulate matter and visible emissions as submitted by the Governor on December 29, 1975.
(46)
Revisions to Regulation I, Sections 111.2(8), 111.2(9), 111.22, 111.91 and 111.92 for control of particulate matter and visible emissions as submitted by the Governor on April 13, 1979.
(48)
Revisions to Subchapters 115.111-115.113 (formerly 131.07.52.101-131.07.52.104) regarding gasoline bulk terminals, 115.123-115.124 (formerly 131.07.53.101-131.07.53.103) regarding gasoline bulk plants, and 115.131-115.135 (formerly 131.07.54.101-131.07.54.105) regarding the filling of gasoline storage vessels at motor vehicle fuel dispensing facilities (Stage I vapor recovery at service stations) of Regulation V for the counties of Harris, Galveston, Brazoria, Bexar, Dallas, and Tarrant were adopted by the Texas Air Control Board on March 30, 1979 and submitted by the Governor to EPA on April 13, 1979.
(49)
Revisions to Subchapters 115.111 and 115.113 (formerly 131.07.52.101 and 131.07.52.103) regarding gasoline bulk terminals, 115.121 and 115.123 (formerly 131.07.53.101 and 131.07.53.103) regarding gasoline bulk plants, and 115.131, 115.132, and 115.135 (formerly 131.07.54.101, 131.07.54.102, and 131.07.54.105) regarding the filling of gasoline storage vessels at motor vehicle fuel dispensing facilities (Stage I vapor recovery at service stations) of Regulation V were adopted by the Texas Air Control Board on July 11, 1980 and submitted by the Governor to EPA on July 25, 1980.
(50)
Revisions to the General Rules (i.e., deletion of the definitions for chemical process plant, exhaust emission, gas processing plant, and non-methane hydrocarbons, and revisions to the definitions for gasoline bulk plant, gasoline terminal, lowest achievable emission rate, standard conditions, submerged fill pipe, paper coating, and light-duty truck coating), Regulation I (i.e., the deletion of sections 111.61-111.65, revisions to title of sections 111.71-111.76 and section 111.71, addition of sections 111.81-111.83, deletion of section 111.91, and revisions to section 111.92 ), and Regulation V (i.e., section 115.1, sections 115.11-115.13, sections 115.31-115.32, sections 115.41-115.45, section 115.81, and section 115.91, all for Bexar County only: and, sections 115.101-115.106; title of sections 115.141-115.144 and section 115.141, section 115.142, and section 115.144; title of sections 115.151-115.153 and section 115.152, and section 115.153; sections 115.161-115.163 and title; title of sections 115.171-115.176 and section 115.173, section 115.175, and section 115.176; title of sections 115.191-115.194 and section 115.191, section 115.192, and section 115.193; title of sections 115.201-115.203 and section 115.203; title of sections 115.221-115.223 and sections 115.222-115.223; sections 115.231-115.233 and title; title of sections 115.251-115.255 and section 115.253, and section 115.255; section 115.401; title of sections 115.411-115.413 and sections 115.411 and 115.412; title only of sections 115.421-115.424) were adopted by the Texas Air Control Board on January 8, 1982, and submitted by the Governor on August 9, 1982, with an addendum from the State on January 13, 1983.
(51)
A revision to Section III (Public Participation/Intergovernmental Coordination) was submitted by the Texas Air Control Board on August 17, 1982 and a letter of clarification was submitted on January 28, 1983. The revision also supercedes and deletes Section XIII which was approved on May 31, 1972.
(52)
An administrative revision to Section IX, Air Quality Surveillance, was submitted by the TACB on June 22, 1983. (Nonregulatory)
(53)
A revision to Regulation VI (i.e., the addition of section 116.11) was adopted by the Texas Air Control Board on December 3, 1982, and submitted by the Governor on May 13, 1983.
(54)
Revisions to the Texas State Implementation Plan for lead for Dallas County (concerning a lead control plan for the area around the secondary lead smelter in West Dallas), were submitted to EPA on April 6, 1984, by the Governor of Texas, as adopted by the Texas Air Control Board on February 17, 1984.
(55)
Revisions to the Texas State Implementation Plan for lead for Dallas County (concerning a lead control plan for the area around the secondary lead smelter in South Dallas), and revisions to Regulation III, chapter 113, Subchapter B, Lead Smelters in Dallas County, were submitted to EPA on July 16, 1984, by the Governor of Texas, as adopted by Texas Air Control Board on May 18, 1984. No action is taken on Regulation III, Sections 113.113 and 113.114.
(56)
Revisions to the Texas State Implementation Plan for lead for El Paso County, with revisions to Regulation III, Chapter 113, Subchapter B, Nonferrous Smelters in El Paso County, were submitted to EPA on June 20, 1984, by the Governor of Texas, as adopted by Texas Air Control Board on February 17, 1984. Also, letters providing additional information were submitted by Texas on June 11 and June 28, 1984. No action is taken on Regulation III, Sections 113.111 113.112. The date of compliance listed in § 113.122 of February 28, 1989 (for section 113.53) is disapproved. EPA is taking no action on the attainment date for El Paso County.
(59)
Revisions to TACB Regulation VI and definitions in the General Rules as adopted on June 10, 1983 and submitted by the Governor on December 22, 1983, including a letter of clarification on their definitions submitted by the Texas Air Control Board on March 27, 1984.
(60)
The Alternative Emission Control Plan for the Exxon Baytown Refinery in Baytown, Texas was adopted by the Texas Air Control Board on March 18, 1983, in Board Order No. 83-2.
(61)
Revisions to the plan for attainment of the standard for Ozone in Harris County were submitted by the Governor on December 9, 1982, January 3, 1984, and March 18, 1985.
(i)
Revisions adopted on December 3, 1982, include the following changes to Regulation V and the general rules. New sections or sub sections 115.105(7), 115.111(2)(b), 115.111(2)(c), 115.111(2)(d), 115.163, 115.164, 115.193(c)(5), 115.193(c)(6), 115.271, 115.272, 115.273, 115.274, 115.275, and 115.421 are added. Revisions to 115.106(b), 115.106(c), 115.113, 115.141, 115.142, 115.161, 115.162, 115.191(9)(a)(i), 115.251(a)(1), 115.252(a)(4), 115.252(b), 115.252(c), 115.253(a), 115.254, 115.255(c), and 115.401(b) were made. Section 101.1 of the general rules was revised to include definitions of new terms. The revisions also included the following commitments: emissions tracking, pages 87-88; projections of reasonable further progress, pages 91 and 93; and emission reduction commitments for transportation control measures, Appendix V.
(ii)
Revisions adopted on September 9, 1983, include revisions to Regulation IV. New sections or sub sections 114.1(e), 114.1(f), 114.3, and 114.5 are added.
(F)
Department of Public Safety and Texas Air Control Board Rules and Regulations, Texas Vehicle Inspection Act Article XV, and Documentation to Authorize and Support the Implementation and Enforcement of the Texas Vehicle Parameter Inspection and Maintenance Program, Appendix X, containing the following documents:
—Senate Bill 1205
—Letters of commitment from Texas Department of Public Safety, City of Houston Police Department, and Harris County Sheriff
—Parameter Vehicle Emission Inspection and Maintenance Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, July 1, 1984
—Texas Motor Vehicle Laws, 1981-1982
—Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, November 11, 1983, Sections A, B, C pages C-1, C-16, C-17, C-18, C-26, C-27, and C-28, D, and E pages E-1, E-6, E-7, E-8, and E-9.
(62)
Revision to the Texas State Implementation Plan for Good Engineering Practice—Stack Height regulations, Texas Air Control Board Regulation VI, § 116.3(a)(14), as adopted by the Texas Air Control Board on July 17, 1987, were submitted by the Governor of Texas on October 26, 1987. This revision included definitions for owner or operator, emission limitation and emission standards, stack, a stack in existence, dispersion technique, good engineering practice, nearby, excessive concentration, and regulations related to stack height provisions and stack height procedures for new source review.
(63)
Revisions to TACB Regulation VI and definitions in the General Rules were submitted by the Governor on December 13, 1985.
(i)
Incorporation by reference. December 13, 1985 letter from the Governor to EPA, and Revisions adopted on September 20, 1985, include the following changes to Regulation VI and the General Rules. Revisions to § 116.11 were made, and § 101.1 of the General Rules was revised to include an amendment to the term major facility/stationary source.
(64)
Board Order No. 85-2, an alternate emission reduction plan for the Continental Can Company, U.S.A. can coating plant in Longview, Texas was submitted by the Governor on July 25, 1985, as amendments to the Texas State Implementation Plan. The source is now subject to the legally enforceable requirements stated in Board Order No. 85-2 and in TACB Permit Number -C-16765.
(A)
Texas Air Control Board Order No. 85-2 adopted on May 10, 1985, and TACB Permit Number C-16765 as revised November 21, 1986.
(65)
In a October 26, 1987, letter, the Governor of Texas submitted a revision to the Texas State Implementation Plan for Lead in El Paso County. These revisions to the control strategy are adequate to demonstrate attainment by August 14, 1987, of the National Ambient Air Quality Standards for lead in El Paso County by modeling. Enclosed in this letter were Texas Air Control Board (TACB) Board Order No. 87-14 as passed and approved on August 14, 1987; the revisions to Regulation III, Subchapter B as appended to the Board Order; and a certification of Public Hearing.
(66)
Revisions to the plan for attainment of the standard for ozone in Dallas and Tarrant Counties were submitted by the Governor on September 30, 1985 and December 21, 1987.
(A)
Revisions to the Texas Air Control Board Regulation IV, Section 114.1 (c), (e), (f), 114.3, 114.5 (a), (b), (d), (e), (f), and (g) adopted July 26, 1985.
(B)
Vehicle Inspection and Maintenance and Transportation Control Measures (VIMTCM), Appendix AG, Emission Reduction Commitments for Transportation Control Measures in Post-1982 SIP Areas adopted by the Texas Air Control Board on August 28, 1985.
(C)
VIMTCM, Appendix AJ, Excerpted Senate Bill 725, section 35 (d) and (g) effective September 1, 1985; and House Bill 1593 sections 21 and 22 effective June 18, 1987.
(D)
The following portions of VIMTCM, Appendix AK, Texas Vehicle Parameter Inspection and Maintenance Program adopted by the Texas Air Control Board on December 18, 1987.
1 Record keeping and Record submittal Requirements, pages 15-17
2 Quality Control, Audit and Surveillance Procedures, pages 17-18
3 Procedures to Assure that Noncomplying Vehicles are Not Operated on the Public Roads, pages 18-20
4 Mechanic Training Program, pages 21-23
5 A Public Awareness Plan, pages 23-25
6 Vehicle Maintenance Program (Anti-tampering), pages 25-27
(E)
VIMTCM, Appendix AM, Department of Public Safety Rules and Regulations Concerning Vehicle Inspection and Maintenance Programs, Sections 1, 2, and 3 adopted by the Texas Air Control Board on December 18, 1987.
(F)
VIMTCM, Appendix AN, Local Government Letters of Commitment to Enforce Vehicle Inspection and Maintenance Programs adopted by the Texas Air Control Board on December 18, 1987.
(67)
Part II of the Visibility Protection Plan was submitted by the Governor on November 18, 1987. This submittal includes a visibility long-term strategy and general plan provisions as adopted by the Texas Air Control Board on September 18, 1987.
(A)
Revision entitled, “State Implementation Plan Revisions for Visibility Protection in Class I Areas: Phase I, September 18, 1987” (including Appendices A and B).
(69)
Revisions to the plan for attainment of the standard for ozone in Dallas and Tarrant Counties were submitted by the Governor on October 11, 1985, December 21, 1987, and December 13, 1988. EPA is approving these stationary source VOC regulations and commitments under part A, section 110 of the Clean Air Act. However, these regulations do not represent RACT under part D, section 172 of the Clean Air Act for numerous reasons, including cross-line averaging and director's equivalency determinations without first being submitted to and approved by EPA as a SIP revision.
(A)
Revisions to Texas Air Control Board Regulation V (31 TAC chapter 115), Control of Air Pollution from Volatile Organic Compounds: Rules 115.111 introductory paragraph; 115.111(2)(E); 115.111(2)(F); 115.113 introductory paragraph, 115.113 last entry in table; except El Paso County for Rules 115.131 introductory paragraph, 115.132(6), 115.132(7), 115.135 introductory paragraph, and 115.135 second to last entry in table; 115.162 introductory paragraph only; 115.163(b)(2); 115.163(b)(3); 115.164(b) first paragraph only; 115.164(b)(3); 115.164(b)(4); 115.171(a); except El Paso County for Rule 115.171(b); 115.175(f); 115.176(a); 115.176(c); 115.191(9)(A)(iii); 115.191(9)(A)(iv); 115.191(9)(A)(v); 115.193(c)(3); 115.223; except El Paso County for Rules 115.261 undesignated heading, 115.261 introductory paragraph, 115.262(a), and 115.264; as adopted by the Texas Air Control Board on July 26, 1985. Rules 115.171(c); 115.171(d); 115.176(d); 115.193(c) first paragraph only; 115.193(c)(1); 115.193(c)(2);115.193(c)(6); 115.193(d) first paragraph only; 115.193(e); 115.194; 115.201(b)(1); 115.202; 115.203(a); and 115.291 through 115.294 and the corresponding undesignated heading; as adopted by the Texas Air Control Board on December 18, 1987. Rules 115.111(4)(C); except El Paso County for Rule 115.111(5); 115.111(6); 115.111(7); 115.113 last entry in table; 115.131(2); except El Paso County for Rule 115.131(3); 115.131(4); 115.131(5); 115.132 introductory paragraph only; 115.132(2); 115.134(3); 115.135 last entry in table; 115.141(a); 115.141(b); 115.142(a) first paragraph; 115.142(b); 115.143(a); 115.143(b); 115.143(c); 115.144; 115.162(3)(B); 115.163(a); 115.163(c); 115.163(d); 115.164(b)(7); 115.171(e); 115.172(a) first paragraph only; 115.172(a)(1); 115.172(a)(3); 115.172(a)(4); 115.172(a)(5)(A); 115.172(a)(6); 115.172(a)(7); 115.172(b) first paragraph only; 115.172(b)(1); 115.173(a) first paragraph only; 115.173(a)(2); 115.173(a)(4)(A); 115.173(a)(4)(B); 115.173(a)(4)(E); 115.173(a)(6); 115.173(b) first paragraph only; 115.173(b)(2); 115.173(b)(4); 115.173(b)(5); 115.173(b)(10); 115.173(b)(11); 115.173(c); 115.174(a) first paragraph only; 115.174(a)(1)(A); 115.174(a)(1)(B); 115.174(a)(1)(C); 115.174(a)(7); 115.174(a)(8); 115.174(a)(9); 115.174(b) first paragraph only; 115.174(b)(2); 115.174(b)(4); 115.174(b)(5); 115.174(c); 115.175(e); 115.175(g); 115.176(e); 115.191(a) first paragraph only; 115.191(a)(8)(A); 115.191(a)(8)(B); 115.191(a)(8)(C); 115.191(a)(9)(C); 115.191(a)(11); 115.191(b); 115.191(c); 115.192(a); 115.192(b); 115.192(c); 115.193(f); 115.201(a); 115.201(b) first paragraph only; 115.201(b)(2) through 115.201(b)(6); 115.201(c); 115.203(b); 115.221(a) first paragraph only; 115.221(a)(4); and 115.221(b); as adopted by the Texas Air Control Board on October 14, 1988.
(B)
Revisions to the Texas Air Control Board General Rules (31 TAC chapter 101), rule 101.1, Definitions for: automobile refinishing; consumer-solvent products; as adopted by the Texas Air Control Board on December 18, 1987. Rule 101.1, Definitions for: architectural coating; automotive primer or primer surfacers (used in automobile refinishing); automotive wipe-down solutions; coating application system; delivery vessel/tank-truck tank; exempt solvent; flexographic printing process; non-flat architectural coating; packaging rotogravure printing; publication rotogravure printing; rotogravure printing; surface coating processes; transfer efficiency; and vapor balance system; as adopted by the Texas Air Control Board on October 14, 1988.
(C)
The following portions of the Post-1982 Ozone Control Strategies Dallas and Tarrant Counties Texas State Implementation Plan Revisions (TX82SIP), as adopted by the Texas Air Control Board on December 18, 1987.
(1 )(d) Emissions Tracking, page 56 (last paragraph), 57, and 58.
(2 )(e) Regulation Review, pages 58-60.
(3 )(a) Emissions Reductions and Growth Unaffected by This Plan, page 63 (first two full paragraphs).
(4 )(e) Transportation Control Measures, pages 67-68.
(5 )(4) Projection of Reasonable Further Progress (RFP), pages 71-72.
(6 )(5) Contengency Plan, page 72.
(7 )(a) Emissions Reductions and Growth Unaffected by This Plan, page 75.
(8 )(e) Transportation Control Measures, pages 79-80.
(9 )(4) Projection of Reasonable Further Progress (RFP), pages 83-84.
(10 )(5) Contingency Plan, page 84.
(D)
TX82SIP, appendix AG, Emission Reduction Commitments for Transportation Control Measures in Post-1982 SIP Areas, as adopted by the Texas Air Control Board on December 18, 1987.
(A)
A letter dated September 25, 1989, from Allen Eli Bell, Executive Director, Texas Air Control Board to Robert E. Layton Jr., P.E., Regional Administrator, EPA Region 6.
(C)
TX82SIP, appendix AL, Transportation Control Measure Evaluation and Documentation of Highway Vehicle Data adopted by the Texas Air Control Board on December 18, 1987.
(70)
On March 12, 1982, the Governor of Texas submitted a request to revise the Texas SIP to include an Alternative Emission Reduction Plan for the E.I. Du Pont de Nemours & Company's Sabine River Works at Orange, Orange County, Texas. This Bubble uses credits obtained from the shutdown of sixteen methanol storage tanks and a methanol truck and railcar loading terminal in lieu of controls on one cyclohexane storage tank and two methanol storage tanks.
(A)
Texas Air Control Board Order No. 82-1, entitled “E.I. Du Pont de Nemours and Company Incorporated” passed and approved by the Board on January 8, 1982.
(A)
Letter dated October 23, 1989, from the Director of the Texas Air Control Board (TACB) Technical Support and Regulation Development Program, giving assurances that the State has resources and plans necessary to strive toward attainment and maintenance of the National Ambient Air Quality Standard (NAAQS) for ozone taking into account the influence of this Bubble on air quality.